Sandwell Local Plan - Reg 19 Publication
APPENDIX L – Transport Proposals
Acronyms |
|
LNIP |
Local Network Improvement Fund |
CRSTS |
City Region Sustainable Transport Settlement |
TBD |
To be determined |
FBC |
Full Business Case |
OBC |
Outline Business Case |
DfT |
Department for Transport |
MRNF |
Major Roads Network Fund |
LLMF |
Large Local Majors Fund |
RIS |
Roads Investment Strategy |
BSIP |
Bus Service Improvement Plan |
LCWIP |
Local Cycling & Walking Infrastructure Plan |
TfWM |
Transport for West Midlands |
Project |
SLP Transport Policies |
Details |
DeliveryBody |
Status@ October2024 |
Funding |
Anticipated DeliveryPeriod |
A4123 Birchley Island / M5 Junction 2 Improvement |
STR1 STR2 STR4 STR5 |
Major junction improvement at Birchley Island to reduce congestion, improve road safety and provide dedicated walking and cycling facilities. Includes some works to adjacent M5, J2. |
Sandwell MBC |
Full Business Case |
Fully funded - DfT MRNF, SMBC |
2025 - 2028 |
M5 Junction 1 Improvement |
STR1 STR2 STR4 STR5 |
Major junction improvement M5, J1 to reduce congestion, improve road safety and provide bus priority, along with dedicated walking and cycling facilities. |
Sandwell MBC / National Highways |
Feasibility |
Subject to approval - DfT LLMF / RIS, SMBC |
Post 2028 |
Wednesbury to Brierley Hill Extension, Phase 1 (Wednesbury to Dudley) |
STR1 |
Extension to West Midlands Metro linking existing Birmingham to Wolverhampton Line with Dudley town centre via Dudley Port railway station. Phase 2 (see below) will continue the route to Brierley Hill / Merry Hill. |
TfWM |
Under construction |
Fully funded |
Anticipated completion - late 2024 |
A34 / A45 SPRINT, Phase 2 |
STR1 |
Completion of Bus Rapid Transit highways improvement works consisting of bus lanes and other bus priority measures on the corridor between Walsall and Solihull / Birmingham Airport via Great Barr and Birmingham city centre. |
TfWM |
Under construction |
CRSTS |
Anticipated completion - early 2025 |
Wednesbury to Brierley Hill Extension Sustainable Access Measures |
STR1 STR5 |
Walk and cycle routes to link local neighbourhoods with new Metro stops in Sandwell and Dudley on the Wednesbury to Brierley Hill Extension. |
Sandwell MBC / Dudley MBC |
Under construction |
CRSTS |
2024 - 2027 |
Wednesbury to Walsall Rapid Transit |
STR1 |
Rapid Transit link from Wednesbury to Walsall - The actual mode is to be determined through a feasibility study, but an existing rail corridor is available. |
TfWM |
Feasibility |
Feasibility - CRSTS Delivery - TBD |
Post 2032 |
A4123 Bus, Cycle & Walking Corridor |
STR1 STR2 STR4, STR5 |
Bus priority measure, segregated cycling and walking improvements on the A4123 (Birmingham New Road, New Birmingham Road, Wolverhampton Road) between Wolverhampton city centre and Hagley Road. |
Sandwell MBC / Dudley MBC / City of Wolv'ton |
Full Business Case |
CRSTS & (subject to approval) CRSTS2 |
Phase 1: 2025-27 Phase 2: 2027-32 |
A461 Bus, Cycle & Walking Corridor |
STR1, STR2, STR4, STR5 |
Bus priority measures, segregated cycling and walking improvements on the A461 (Horseley Heath, Dudley Port, Burnt Tree, Birmingham Road) between Great Bridge and Castle Gate in Dudley. |
Sandwell MBC / Dudley MBC |
Full Business Case |
CRSTS & (subject to approval) CRSTS2 |
Phase 1: 2025-27 Phase 2: 2027-32 |
Smethwick to Birmingham Inclusive Growth Corridor Transport Package |
STR1, STR2, STR4, STR5 |
Highway measures to provide bus priority, segregated walking and cycling routes in support of housing growth in Grove Lane/Midland Metropolitan University Hospital area. Cycle route includes a section within the boundary of Birmingham City Council to link with its route to the city centre. |
Sandwell MBC / Birmingham CC |
Full Business Case |
CRSTS |
2025 - 2027 |
West Midlands LCWIP Programme |
STR5, STR6 |
Package of works to deliver West Midlands LCWIP projects across the Black country. |
Sandwell MBC / TfWM |
Varies |
Active Travel Fund CRSTS & (subject to approval) CRSTS2 |
2025-32 |
Black Country LCWIP Programme |
STR5, STR6 |
Package of works to deliver cycling & walking projects across the Black country. |
Black Country Local Authorities |
Varies |
Active Travel Fund CRSTS & (subject to approval) CRSTS2 |
2025-32 |
Sandwell LCWIP Programme |
STR5, STR6 |
Package of works to deliver Sandwell LCWIP projects across the Black Country. |
Sandwell MBC |
Varies |
Active Travel Fund CRSTS & (subject to approval) CRSTS2 |
2025-32 |
West Midlands Bus Service Improvement Plan infrastructure programme |
STR1, STR2, STR5, STR6, STR7 |
Bus priority measures on the West Midlands Core Bus Network. Covers numerous corridors in Sandwell. |
TfWM / West Midlands Local Authorities |
Varies - early delivery routes at FBC stage, later routes are at Feasibility |
BSIP Fund, CRSTS (subject to approval) CRSTS2 |
2024-32 |
Black Country EV Infrastructure Programme |
STR9 |
Introduction of Electric Vehicle Charge Points on-street and in public car parks. |
Black Country Local Authorities |
Full Business Case First round in delivery |
ORCS, CRSTS & (subject to approval) CRSTS2 |
2024-25 |
Blackheath Interchange |
STR1, STR6 |
Modifications to town centre street pattern to enable improved interchange between bus services, road safety measures and upgraded public realm. |
Sandwell MBC |
Full Business Case |
Towns Fund |
2024-25 |
Dudley Port Integrated Transport Hub, Phase 1A |
STR1 |
Improvements at the station at concourse level to integrate bus stops and the metro stop, including step-free access. Introduction of improved lighting, security and EV chargers. |
TfWM / Network Rail / SMBC |
Full Business Case |
CRSTS |
2025-2027 |
Dudley Port Integrated Transport Hub, Phases 1B and 2 |
STR1 |
Major alterations at platform level to improve passenger shelter, enable longer trains, step-free access between platforms and concourse. May be delivered in sub-phases. |
Network Rail / TfWM |
Feasibility |
TBD |
Post 2027 |
Stourbridge to Walsall Freight Line Re-opening |
STR4 |
Reinstatement of heavy rail freight services between Stourbridge Junction and Bescot. Involves an element of track sharing with metro so subject to approval of tram-train technology. |
Network Rail / TfWM |
Feasibility |
TBD |
Post 2041 |
A41 Albion Junction (Carters Green) Improvement |
STR1, STR2, STR4, STR5 |
Junction improvement improve capacity, provide bus priority and improved active travel provision. |
Sandwell MBC |
Feasibility |
CRSTS2 (subject to approval) |
2027-32 |
A4100, Lower High Street / Forge Lane / Woods Lane Junction Improvement, Cradley Heath |
STR1, STR2, STR4 |
Junction improvement to improve road safety. |
Sandwell MBC |
In Design |
CRSTS - LNIP |
2025-27 |
Greets Green Road / Ryders Green Road Junction Improvement, West Bromwich |
STR1, STR2, STR4 |
Junction improvement |
Sandwell MBC |
Under review |
LNIP |
TBD |
Lower Church Lane Improvement, Tipton |
STR1, STR2, STR4 |
Carriageway re-alignment |
Sandwell MBC |
Under review |
LNIP |
TBD |
Oldbury Road / Albion Road Junction Improvement, West Bromwich |
STR1, STR2, STR4 |
Junction improvement |
Sandwell MBC |
Under review |
LNIP |
TBD |
Table 2-Proposalsoutside Sandwellthatdirectly supportthe SpatialStrategy
Project |
Transport Policies |
Details |
DeliveryBody |
Status@ October2025 |
Funding |
Anticipated DeliveryPeriod |
Wednesbury to Brierley Hill Extension, Phase 2 (Dudley to Brierley Hill) |
STR1 |
Completion of West Midlands Metro Extension from Dudley Town Centre to Brierley Hill via Merry Hill Centre. |
TfWM |
Full Business Case |
TBC |
2025-27 |
Stourbridge to Brierley Hill Rapid Transit |
STR1 |
Rapid Transit link from Brierley Hill to Stourbridge - The actual mode is to be determined through a feasibility study, but an existing rail corridor is available. |
TfWM |
Feasibility |
Feasibility - CRSTS Delivery - TBD |
Post 2032 |
Midlands Rail Hub |
STR1 |
Major package of works to increase capacity on lines into Birmingham including Bordesley Cords, Snow Hill Platform 4, reinstatement and increased use of Moor Street Station. |
Network Rail |
Outline Business Case |
DfT |
Post 2032 |
Walsall to Aldridge Line Re-opening |
STR1 |
Re-introduction of passenger services on current freight-only line. |
Network Rail / TfWM |
Feasibility |
TBD |
2027-32 |
Wolverhampton to Shrewsbury Railway Line Upgrade |
STR1 |
Electrification of line between Wolverhampton and Shrewsbury via Telford. Provides increased capacity through improved headways. |
Network Rail |
Feasibility |
TBD |
Post 2032 |