Sandwell Local Plan - Reg 19 Publication

Ends on 11 November 2024 (26 days remaining)

APPENDIX I – Sandwell Local Plan Housing Trajectory

Sandwell Housing Trajectory

[13] Estimated Total Landfill Capacity in tonnes has been calculated from the remaining landfill capacity in cubic metres at the end of 2018, using the following formula: 0.85 tonne = 1 cubic metre, therefore tonnes = cubic metres x 0.85.

[14] Allotments are covered in more detail in Policy SHW6.

[15] Smaller areas of open space that are not identified on the Policies Map will also be subject to Policy SHW4

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top