Sandwell Local Plan - Reg 19 Publication

Search representations

Results for Home Builders Federation search

New search New search

Comment

Sandwell Local Plan - Reg 19 Publication

Duty to Co-operate

Representation ID: 1531

Received: 11/11/2024

Respondent: Home Builders Federation

Representation Summary:

7. HBF note that a Duty to Cooperate Statement dated Sept 2024 has been prepared, https://www.sandwell.gov.uk/downloads/file/3267/slp-reg-19-duty-to-co-operate-statement but that is not included on the Reg 19 consultation website https://sandwell.oc2.uk/ and has to be searched for separately on the Council’s website, as does the consultation statement and other supporting documentation.

8. Table 2 of the DTC statement sets out the Statements of Common Ground in relation to the apportionment of contributions between the four Black Country LPAs and the apportionment of contributions between the Greater Birmingham and Black Country Housing Market Area and an agreement to refresh the Housing Growth Study remain in discussion. As does the SoCG about Telford and Wrekin council making a housing land contribution.

9. HBF therefore remain unclear if the Duty to Cooperate has been met. Although we welcome the DTC Statement, which we requested in our Reg 18 response, the current position of nieghbouring authorities in relation to Sandwell’s Local Plan remains unclear. HBF agree that meeting unmet housing need was one of the main strategic matters being addressed through the Black Country Plan and as such continues to be one of the principal cross-boundary issues to be addressed in the preparation of the Sandwell Local Plan.

Object

Sandwell Local Plan - Reg 19 Publication

Vision for Sandwell

Representation ID: 1532

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Vision is not considered to be sound as it is not justified or effective or in line with national policy.

14. The Vision is very long and imprecise, similarly the Plan’s objectives are very numerous. HBF question if this is effective.

15. Although HBF support has supports the need for the Vision for Sandwell to include reference to the need for new homes to meet housing need, as included within Ambition 7 we suggest this should be amended to be more explicit about the requirement to meet the development needs of the area. HBF would suggest that both the Vision and Objective Six should be more explicit about the need to plan for both open market and affordable housing to meet housing needs and support the Council’s growth aspirations.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SDS1 – Spatial Strategy for Sandwell

Representation ID: 1533

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

Housing Requirement- dpa and total

16. The Reg 18 version of the Plan proposed at least 11,167 net new homes and at least 1,206ha of employment land (of which 29ha is currently vacant). The Reg 19 version of the Plan reduces the Housing Requirements to 10,434 net new homes.

17. It is noted that paragraph 2.6 explains that “There is still, despite the number of housing sites that have been identified and allocated, a shortfall in the numbers of houses that need to be built to meet identified needs. Housing need is calculated using the Government’s standard method based on household growth projections.

• Sandwell needs to identify land for 26,350 homes by 2041.
• The supply of suitable residential land based on the most recent evidence stands at 10,434 homes.
• There is an unmet need for 15,916 homes.!

18. This means that the council is planning only to meet 40% of their proposed housing number, with 60% not being planned for. HBF believe the housing requirement should be higher to start with and so the percentage of unmet need would be even higher. Even, setting this aside for now, HBF is very concerned about this proposed shortfall. Failure to meet the housing needs of Sandwell will inhibit growth and do nothing to address the current housing crisis, with implications for the economy and population of wider region. It will be important for the Council to clearly show how the unmet need will be met, and what they will do to ensure that it is. However, the Council needs to first establish the appropriate housing requirement for Sandwell before considering if and how this could be met.

19. The Reg 18 version of the Plan sought to plan for 187 ha of employment, this need has increased in the Reg 19 version para 2.14, as amended by the errata document, now says:

“Employment land need is based on economic forecasts in the EDNA up to 2041.
• Sandwell is subject to a demand for 212ha of employment land.
• The current supply of land available and suitable for employment use is 42ha (after completions between 2020 – 2022 are considered). This includes windfall supply, generated through intensification / recycling, and also includes a vacant land supply of 28ha (sites identified under
Policy SEC1).
• Based on the amount of land required to grow the economy, there is a shortfall of around 170ha.
• In addition, the plan allocates / retains 1,193ha of existing occupied employment as strategic, local or other employment land.

20. HBF notes that the Plan therefore proposes not only significant unmet housing need but also a significant unmet employment need. This would further constrain the ambitions for Growth in Sandwell, and the wider region. HBF suggest these circumstances warrant a full Green Belt review and the allocation of sites to meet the housing and employment requirements of the Borough even if these are within the current Green Belt.
21. With regards the housing requirement itself, HBF strongly support the need for more housing in the Sandwell Local Plan for a variety of reasons including addressing the current housing crisis, meeting housing need, providing affordable housing and supporting employment growth. HBF would request that the Council considers the annual LHN as only the minimum starting point and fully considers all of the issues that may result in a need for a higher housing requirement, including the need to provide a range and choice of sites, the need for flexibility, viability considerations and whether higher levels of open-market housing are required in order to secure increased delivery of affordable housing.

22. Paragraph 22 of the NPPF requires that strategic policies should look ahead over a minimum 15-year period from adoption. HBF note that the current plan period is to 2041 but would still question if the plan period is long enough to cover this requirement. This Reg 18 consultation closes at the end of 2023 and then the representations need to be considered an analysed, a submission plan prepared and consulted, examination, main modifications consultation, inspectors report and adoption by the Council.

23. HBF suggest that the plan-making process may take some time, especially if additional Green Belt release is needed, and suggest that the plan period could be extended now, especially as this would require an update to the evidence base as is important for the evidence base to be consistent with the Plan Period. Extending the plan period would also require an increase to the housing requirement to cover the additional years, and consequential additional housing supply.


24. The Government’s commitment to 1.5 million homes over the next five years has seen ambitions to plan for 370,00 per year in order to deliver the national target of 300,000 new homes per year. HBF note that the standard method housing requirement has always been the minimum starting point for setting the housing requirement, and HBF support more housing than the standard method housing requirement in order to support economic growth, provide a range and type of sites and to support small and medium house builders.

25. HBF suggest that each of these reasons on its own could justify an increase in the housing requirement for Sandwell and the Council should consider planning for an additional amount of housing to address each reason in turn. However, as previously mentioned it is important that the housing requirement is established, before any consideration is given to any issues around housing land supply, or lack thereof.

26. The plan-led system requires Council to proactively plan to meet the needs of their community. This means that there is a need to provide a range and choice of sites, a need for flexibility and viability considerations to be taken into account, and a need for the Council to consider whether higher levels of open-market housing are required in order to secure the delivery of affordable housing and/or support economic growth.

27. Once the housing requirement has been set, the next phase is to consider housing land supply. It is important to both minimise the amount of any unmet needs that cannot be accommodated within the Borough and clearly set out how any unmet need will be addressed elsewhere. HBF recognise the constrained nature of the Borough and the size of the shortfall in Housing and Employment land being proposed in this plan. However, it is important that the housing needs of Sandwell are met in full.

28. Although HBF is pleased to see the Council commit to ongoing working with neighbouring authorities to try an address this matter under the Duty to Cooperate the fact remains that the Local Plan’s policies should ensure the availability of a sufficient supply of deliverable and developable land to deliver Sandwell’s housing requirement. If it is not possible to do this within the Council’s boundary then Green Belt should be considered.

29. Criteria 3 of the policy sets out that “Appendices B and C show how the housing and employment land ambitions for Sandwell will be met. Those development needs that cannot be accommodated within the borough will be exported to sustainable locations in neighbouring local authority areas, following consultation.” HBF suggest this should be set out as an integral part of the policy and not deferred to Appendix B and C.

30. HBF believe that Sandwell’s inability to meet its housing (and employment) needs requires revisiting the Spatial Strategy results in the ‘exceptional circumstances’ that would require the need for a Green Belt review as set out in para 140 of the NPPF.

31. As set out in our comments on the Duty to Cooperate above, HBF remains very concerned about the reliance of the Council on neighbouring authorities to deliver it’s unmet needs, especially in light of the issue the Shropshire Local Plan has recently encountered. These difficulties further underline the need for Sandwell to be doing more to meet its own needs including through a comprehensive Green Belt review and new allocations for housing.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SNE2 – Protection and Enhancement of Wildlife Habitats

Representation ID: 1534

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

41. HBF note that although mandatory national BNG was introduced in the Environment Act 2021 the introduction of Biodoversty Net Gain for planning application did not come for large sites until Feb 12th 2024, and for small sites on 2nd April 2024.

42. HBF has been involved in a significant amount of work, being led by the Future Homes Hub, on BNG preparedness for some time, including feeding into the BNG Planning Practice Guidance and the DEFRA BNG Guidance. It is important for this policy to fully reflect all the new legislation, national policy and MHCLG and DEFRA guidance.

43. HBF note that this represents a lot of new information that the Council will need work though and consider the implications of, in order to ensure that any policy on Biodiversity Net Gain policy complies with the latest policy and guidance now it has been published. It should also be noted that the PPG is clear that there is no need for individual Local Plans to repeat national BNG guidance.

44. It is the HBF’s opinion that the Council should not deviate from the Government’s requirement for 10% biodiversity net gain as set out in the Environment Act. The Plan should provide certainty for developers and a clear BNG policy with a fixed 10% figure, rather than the policy including the phrase “at least 10%” would help to provide this.

45. Any requirements to go beyond 10% BNG needs to be clearly demonstrated with evidence including considering the implications of the policy approach as part of the whole plan viability appraisal. In particular, HBF would question how the viability of more than 10% BNG can be established when the market for off-site credits, and therefore the costs of delivering the 10% mandatory BNG system are still emerging.

46. HBF notes that the proposed policy wording and supporting text will need to reflect both that the Environment Act which requires 10% Biodiversity Net Gain, and the emerging policy, guidance and best practice on how Mandatory Biodiversity Net Gain will be implemented. There is an important policy distinction to made between the national mandatory requirements and any optional further requests from LPAs to go further and faster. In particular the 10% national target is non-negotiable from a viability perspective, but policies seeking over 10% can be challenged on viability grounds. This distinction needs to be recognised within the Local Plan.

47. HBF suggest particular care is needed in terminology to ensure the Sandwell policy reflects the national policy and guidance. For example, on site and off-site biodiversity is referred to as units, and the statutory national credit system of last resort is referred to as credit. It is important for the wording of the policy to accurately reflect the legalisation and guidance.

48. HBF question the wording of criteria five, as it should be for the BNG plan to set out what happens if monitoring shows any BNG measure are ineffective. For large and complex sites where the development is phased, the guidance is clear that the 10% must be delivered at the end of the development, and this may not result in 10% BNG on each phase.

49. It is also important to note that for large and complex sites where the development is phased, the guidance is clear that the 10% must be delivered at the end of the development, and this may not result in 10% BNG on each phase. Additional advice on phased development has been provided in the new BNG PPG.

50. The costs of BNG must also be considered as part of the whole plan viability assessment and should be specified as a single specific item, and not combined into a generic s106 costs item. There are significant additional costs associated with biodiversity net gain, which should be fully accounted for in the Council’s viability assessment, some of which remain unknown at this time. It is important that BNG does not prevent, delay or reduce housing delivery. The costs relate both the financial costs and also land take- which will impact on densities achievable if BNG is provided on site.

51. As this is still a new policy area and the market for off-site provision, and statutory credits are not yet known, any figure used for BNG costs will need to be kept under review as BNG implementation progresses and a greater understanding of actual costs become available. The Whole Plan Viability Assessment must clearly set out how it considered the implications of mandatory BNG and how it as arrived at using the most up to date BNG costs information available. There may need to be further additional flexibility in policies elsewhere in the Plan to reflect the non-negotiable nature of 10% BNG costs.

52. HBF suggest that there is also a need for this policy and supporting text to say more about how BNG will be considered in relation to applications in advance of the Local Nature Recovery Strategies. As the LNRS emerges it will be important for this Local Plan to be kept under review and further public consultation on the interaction between the two documents and/or changes to Local Plan policy and/or its implementation, to reflect the LNRS may be needed.

53. HBF would also encourage the Council to ensure the Local Plan fully considers the new BNG requirements in relation to site allocations. This is likely to require undertaking an assessment of the baseline to support the allocation to enable an understanding the BNG requirements for a site to be allocated and the impact this may have on viability and other policy requirements and considerations. It will be important to understand the BNG costs of mandatory BNG as this is non-negotiable and as such may impact on the viability of the site and its ability to deliver against other policy requirements such as affordable housing or other s106 asks.

54. HBF also notes that there seems to be significant potential for confusion around environmental hierarchy, and suggest particular care is needed to avoid any confusion between the well-established mitigation hierarchy and the new BNG hierarchy. There is need for the policy wording and/or supporting text to be clearer about the differentiation between the mitigation hierarchy (which seeks to avoid harm in the first place, then mitigate and only then compensate it in relation to protected habitats) and the BNG delivery hierarchy (which prioritises on-site BNG delivery, then off-site units and finally allows for statutory credits). There seems to be significant potential for confusion between the two difference hierarchies. HBF therefore suggest that the Council should take particular care to explain how the requirements of the two-part BNG hierarchy work in different ways and that they seek to achieve different aims.

55. BNG will also impacts on the density of housing schemes that can be provided, as land used for on-site BNG is not available for housing. This may require larger and/or additional housing sites to be allocated.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SNE3 – Provision, Retention and Protection of Trees, Woodlands and Hedgerows

Representation ID: 1535

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

56. HBF continue to question how the Council arrived at the requirement for 3 replacement trees for everyone lost and what (if any) assumptions have been relation to the size and standard of trees. HBF considers that a three for one replacement policy could impact on the land uptake for any development and may have implications for the density of developments, which in turn has the potential to have an impact on the viability of developments.

57. HBF suggest further flexibility is needed in the policy, for example hedgerow removal may be an essential to gain access to a site, but BNG policies which require 10% net gain from the pre-development baseline so any loss would already have to be compensated. HBF suggest the Council should give more thought to how the suite of environmental policies are intended to work together so that developers are completely clear what is expected of them, and to ensure that the policies do not serve to make development undeliverable.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SCC1 – Energy Infrastructure

Representation ID: 1536

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

58. HBF supports the Government’s intention to set standards for energy efficiency through the Building Regulations. The key to success is standardisation and avoidance of individual Council’s specifying their own policy approach to energy efficiency, which undermines economies of scale for product manufacturers, suppliers and developers. The Councils do not need to set local energy efficiency standards in a Local Plan policy because of the higher levels of energy efficiency standards for new homes set out in the 2021 Part L Interim Uplift and proposals for the 2025 Future Homes Standard. There is no need for a Local Plan policies on matters already addressed in Building Regulations.

59. HBF question the realism of requiring post-occupancy evaluation as this will require consent of future homeowners and willingness to share their data. This cannot be assumed.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SCC4 - Embodied carbon and waste

Representation ID: 1537

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

60. HBF are concerned about the effectiveness and justification of this policy, especially as the Council acknowledge in para 5.63 of the Plan that there is no reference to ‘embodied carbon’ in the NPPF.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SHO1 - Delivering Sustainable Housing Growth 

Representation ID: 1538

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

61. In relation to criteria one, HBF’s detailed comments in relation to the amount of housing needed in Sandwell can be found in our response to policy SD1: Development Strategy. In summary, HBF request that the standard method LHN should be the minimum starting point for establishing the housing requirement and the Council should then fully considers all of the issues that may result in a need for a higher housing requirement, including the need to provide a range and choice of sites, the need for flexibility, viability considerations and whether higher levels of open-market housing are required in order to secure increased delivery of affordable housing. HBF suggests that these considerations should result in a higher housing requirement for Sandwell which set be set out in the Local Plan. Only then should consideration around deliverability and housing land supply come into play, the housing requirement should be established first.

62. In relation to criteria two, HBF note that the council is looking to phase the plan and delivery of the housing requirement. For the plan to be effective and justified, a clear explanation of this approach and the reasoning behind for it is needed. As HBF is of the view that the overall housing requirement for Sandwell should be higher, it follows that our view is that the numbers in each phase should be higher too.

63. HBF remain of the view that the allocation of site for housing should be undertaken in policy and no relegated to an Appendix.

64. HBF supports the principal of discounted the housing land supply to take account of non-implementation rates. We note that site with planning permission include a lapse rate of 5% other commitments are SHLAA are discounted by 10% and occupied employment land discounted by 15%, but These figures should be clearly evidenced. HBF also notes that no allowance is made for non-delivery of windfall sites and we believe one is needed. HBF would question if the discount rates should in fact be higher especially for sites that are currently occupied in employment use. The anticipated loss of current employment sites to housing further underlines the need for housing and employment to be considered together, and implications of not meeting with the housing and employment need of the borough present the exceptional circumstances required to justify Green Belt release.

65. Para 7.4 of the Plan states that “A balanced range of sites has been provided, in terms of size, location and market attractiveness, which will help to maximise housing delivery over the Plan period. Across the borough, 10% of identified supply in the Plan and in the most recent Brownfield Register is on sites no larger than 1ha, which is in accordance with the requirement set out in the NPPF at paragraph 069.”

66. The NPPF requires Local Plans to identify land to accommodate at least 10% of the housing requirement on sites no larger than one hectare, unless there are strong reasons why this cannot be achieved. The HBF has undertaken extensive consultation with its small developer members. One of the chief obstacles for small developers is that funding is extremely difficult to secure without a full, detailed, and implementable planning permission. Securing an implementable planning permission is extremely difficult if small sites are not allocated. Without implementable consents lenders are uneasy about making finance available or the repayment fees and interest rates they set will be very high. Small developers, consequently, need to invest a lot of money and time up-front in the risky business of trying to secure an allocation and a planning permission, and this is money that many small developers do not have.

67. HBF would therefore wish to see the 10% small sites allowance delivered through allocations. Indeed, we would advocate that a higher percentage of small sites are allocated if possible. Such sites are important for encouraging the growth in SME housebuilders who will tend to develop these sites but rarely see the benefits that arise from the allocation of sites in a local plan. Up until the 1980s, small developers once accounted for the construction of half of all homes built in this country resulting in greater variety of product, more competition, and faster build-out rates. Since then, the number of small companies has fallen by 80%.

68. HBF also note that support for small and medium builders need not be limited to only small sites of less than 1Ha. SMEs also deliver on other types of non-strategic sites (for example up to 100 units). The inclusion of additional non-strategic allocations would expand the range of choice in the market, and (possibly most importantly), be of a scale that can come forward and making a contribution to housing numbers earlier in the plan period.

69. In relation to criteria three, HBF notes that NPPF (para 71) only permits an allowance for windfall sites if there is compelling evidence that such sites have consistently become available and will continue to be a reliable source of supply. HBF are also of the view that any buffer provided by windfall sites should be in addition to the buffer added to the housing need figures derived from the Standard Method to provide choice and competition in the land market. However, by including windfalls within the Plan’s housing requirement supply, any opportunity for windfalls to provide some additional housing numbers and flexibility is removed. Windfalls do not provide the same choice and flexibility in the market as additional allocations.

70. Criteria 3 indicates that regular monitoring will be undertaken annually of housing delivery, but this does not tally with the Monitoring Framework at the end of the Plan.

71. It should also be possible to see from Housing Trajectory how much reliance is being made on windfalls, or from when. To be both justified and effective the Housing Trajectory should include break down the housing numbers into different sources of supply. HBF are of the view that any allowance for windfall should not be included until the fourth year of a housing trajectory, given the likelihood that dwellings being completed within the next three years will already be known about (as they are likely to need to have already received planning permission to be completed within that timeframe).

Object

Sandwell Local Plan - Reg 19 Publication

Policy SHO4 - Affordable Housing

Representation ID: 1539

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

82. HBF welcomes the recognition that the delivery of affordable housing in Sandwell may raise issues of viability. Viability must be an integral part of the plan-making process, and the findings of the viability appraisal should have helped inform and test policy development. HBF have concerned about some of the detail of the Viability Assessment as it has not considered a number of key costs and requirements. For example, HBF information suggests that complying with the current new part L is costing £3500 per plot. The Future Homes Standard Part L in 2025 is anticipated to cost up to £7500+ per plot. There will also be the addition of the Building Safety Levy that is coming in pay for cladding. This will be a per plot basis around the UK, and initial values are around £1500- £2500 per plot. These costs appear to have not been considered in the viability appraisal.

83. Other factors that need to be taken into account include increasing costs of materials and labour due to inflation and the costs of mandatory BNG, which are still emerging as the off-site market is yet to be established. Although the initial price of statutory credits is now known this national fallback option has been deliberately highly priced to discourage their use. Whilst this intention is understandable, at present the lack of functioning local markets for off-site credits causes viability problems because HBF members experience to date suggests that any scheme that needs to rely on statutory credits becomes unviable. HBF have numerous concerns about the whole plan viability study, including the omission of some key policy costs. For example, an realistic and evidenced allowance for mandatory BNG needs to be includes within the viability assessment of the Local Plan.

84. The costs of BNG should have been considered as part of the planning obligations and should be specified as a single specific item. There are significant additional costs associated with biodiversity net gain, which should be fully accounted for in the Council’s viability assessment, some of which are unknown at this time. It is important that BNG does not prevent, delay or reduce housing delivery. As this is an emerging policy area and the market for off-site provision, and statutory credits are not yet known, any figure used for BNG costs will need to be kept under review as BNG implementation progresses and a greater understanding of actual costs become available. The Whole Plan Viability Assessment should clearly set out how it considered the implications of mandatory BNG and how it arrived at the most up to date BNG costs information available to use.

85. At a very basic level viability can be improved by reducing costs or increasing values. Sometimes, therefore changing the type of affordable housing provided can help to improve viability of a specific site, and the plan should recognise this. In this situation there could be a change of the percentages of different types of affordable housing provided, but the headline figure of how much affordable housing is provided would remain the same. Flexibility in the policy is important to allow for these kind of considerations.

86. The geographical distribution of development may impact on the Plan’s ability to deliver affordable housing where it is most needed. HBF notes that the level of open-market housing provided may also impact on the amount of affordable housing that can be developed.

87. It will be also be important to understand if there any geographically specific viability considerations, such as whether higher levels of open-market housing are required in particular areas in order to secure increased delivery of affordable housing in that location in a way that remains viable. Similarly, brownfield city centre sites tend to be most suited for apartments or retirement living. There will therefore be a need to include green fields allocations which are more likely to deliver family housing and a higher percentage of affordable housing, in order to provide flexibility in the housing land supply and ensure a range of housing types and tenures is provided. This adds further weigh to the need to consider Green Belt release(s).

88. The HBF does not comment on individual sites, other than to say the Plan should provide for a wide range of deliverable and developable sites across the area in order to provide competition and choice and a buffer to ensure that housing needs are met in full. The soundness of strategic and non-strategic site allocations, whether brownfield or greenfield, will be tested in due course at the Local Plan Examination.

Object

Sandwell Local Plan - Reg 19 Publication

Policy SHO5 - Delivering Accessible and Self / Custom Build Housing

Representation ID: 1540

Received: 11/11/2024

Respondent: Home Builders Federation

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy is not considered to be sound as it is not justified or effective or in line with national policy.

89. This policy still seeks to require all new residential developments to meet M4(2) (Accessible and adaptable dwellings) of Building Regulations and development of 10 or more units to provide 15% which meet M4(3) (Wheelchair user dwellings) on schemes of more than 20 homes.

90. The requirements to meet Part M4(2) will be superseded by changes to residential Building Regulations. The Government response to ‘Raising accessibility standards for new homes’ states that the Government proposes to mandate the current M4(2) requirement in Building Regulations as a minimum for all new homes, with M4(1) applying in exceptional circumstances. This will be subject to a further consultation on the technical details and will be implemented in due course through the Building Regulations. The requirement to address this issue is planning policy is therefore unnecessary.

91. HBF are of the view that this matter should be left to Building Regulations, however if a policy were to be needed, the wording needs to differentiate between Part a) and part b) of M4(3) technical standards. M43a sets out standards for wheelchair adaptable housing, where M43b relates to wheelchair accessible housing which can only be required on affordable housing where the Council has nomination rights. Any such requirements would also need to be fully considered from a viability perspective.

92. The PPG states:

“What accessibility standards can local planning authorities require from new development?

Where a local planning authority adopts a policy to provide enhanced accessibility or adaptability they should do so only by reference to Requirement M4(2) and/or M4(3) of the optional requirements in the Building Regulations and should not impose any additional information requirements (for instance provision of furnished layouts) or seek to determine compliance with these requirements, which is the role of the Building Control Body. They should clearly state in their Local Plan what proportion of new dwellings should comply with the requirements. There may be rare instances where an individual’s needs are not met by the wheelchair accessible optional requirement – see paragraph 011 below.

Local Plan policies should also take into account site specific factors such as vulnerability to flooding, site topography, and other circumstances which may make a specific site less suitable for M4(2) and M4(3) compliant dwellings, particularly where step free access cannot be achieved or is not viable. Where step-free access is not viable, neither of the Optional Requirements in Part M should be applied.”

Paragraph: 008 Reference ID: 56-008-20160519 Revision date: 19 05 2016

93. The PPG sets out some of the circumstances where it would be unreasonable to require M4(2) and M4(3) compliant dwellings. Such factors include flooding, typography and other circumstances. HBF suggest that flexibility is needed in the application of these standards to reflect site specific characteristics, and the policy wording should reflect this. HBF do not believe this policy is sound without this flexibility, as it fails to comply with national policy and is not effective or justified.

94. In relation to Self-Build and Custom Build Plots, the policy requires sites of 100 or more dwellings, to provide at least 5% as serviced plots for self and custom build, if there is evidence of demand. If after six months of a thorough an proportionate marketing exercise the plot remains unsold, the requirements falls away.

95. HBF does not consider that requiring major developments to provide for self-builders is appropriate. Instead, the HBF advocates for self and custom-build policies that encourage self and custom-build development by setting out where it will be supported in principle. The HBF considers that Councils can play a key role in facilitating the provision of land as set in the PPG. This could be done, for example, by using the Councils’ own land for such purposes and/or allocating sites specifically for self and custom-build home builders- although this would need to be done through discussion and negotiation with landowners.

96. It is considered unlikely that the provision of self and custom build plots on new housing developments can be co-ordinated with the development of the wider site. At any one time, there are often multiple contractors and large machinery operating on-site from both a practical and health and safety perspective, it is difficult to envisage the development of single plots by individuals operating alongside this construction activity.

97. HBF agree that if demand for plots is not realised, it is important that plots should not be left empty to the detriment of neighbouring properties or the whole development. The timescale for reversion of these plots to the original housebuilder should be as short as possible from the commencement of development because the consequential delay in developing those plots presents further practical difficulties in terms of co-ordinating their development with construction activity on the wider site. There are even greater logistical problems created if the original housebuilder has completed the development and is forced to return to site to build out plots which have not been sold to self & custom builders. Therefore, if the current policy requirements are retained HBF would support the suggestion that any unsold plots remaining after the 6-month marketing period revert to the original developer.

For instructions on how to use the system and make comments, please see our help guide.