Sandwell Local Plan - Reg 19 Publication
Representation ID: 1309
Received: 28/10/2024
Respondent: Vulcan Property II Limited
Agent: Sevo Planning Limited
Vulcan commented on the draft Regulation 18 wording of Policy SDM1 (‘Design Quality’), with neither support nor objection raised. Vulcan and its advisors encouraged clear policy with design expectations and detail of how proposals would be tested against policy, having regard to national guidance and material considerations.
Vulcan has no further comment to make on the draft wording of Policy SDM1, as contained in the Regulation 19 version of the Local Plan.
Vulcan commented on the draft Regulation 18 wording of Policy SDM1 (‘Design Quality’), with neither support nor objection raised. Vulcan and its advisors encouraged clear policy with design expectations and detail of how proposals would be tested against policy, having regard to national guidance and material considerations.
In its response to representations to the Regulation 18 Local Plan, the Council acknowledges Vulcan’s comments and reiterated that the Sandwell Local Plan “states that a design code for the borough will be prepared – until such time, extant local and national guidance will be used as necessary to provide a context for decisions on design.”
The wording of Regulation 19 Policy SDM1 (‘Design Quality’) is closely similar to the draft wording as provided in the Regulation 18 Local Plan, an exception being the inclusion of a tenth principle; that principle being “the need to mitigate and adapt to the impacts of climate change in accordance with the relevant policies in the plan”.
Vulcan has no further comment to make on the draft wording of Policy SDM1, as contained in the Regulation 19 version of the Local Plan.
Support
Sandwell Local Plan - Reg 19 Publication
Representation ID: 1429
Received: 08/11/2024
Respondent: Sport England
Sport England supports the approach in this policy to achieving good place making, and welcomes the reference in para 15.20 to Sport England's Active Design guidance, within which we draw out how Sport England's 10 Active Design principles align with those within the National Design Guide. We are pleased to see that a hyperlink to our guidance has been added at footnote 262.
Sport England supports the approach in this policy to achieving good place making, and welcomes the reference in para 15.20 to Sport England's Active Design guidance, within which we draw out how Sport England's 10 Active Design principles align with those within the National Design Guide. We are pleased to see that a hyperlink to our guidance has been added at footnote 262.
Object
Sandwell Local Plan - Reg 19 Publication
Representation ID: 1472
Received: 11/11/2024
Respondent: Oldbury (Smethwick) Limited
Agent: Planning Prospects Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Not specified
It is welcome that Draft Policy SDM1 (Design Quality) part 1) requires developments to address its listed criteria “where appropriate” and has some flexibility in this regard.
Similarly, Part 2 of the draft Policy requires development proposals to demonstrate that its listed Guidance has been considered and “where appropriate” used to inform design and access statements that reflect their Sandwell-specific context, and also has some flexibility in this
regard.
However, at part 3) the policy requires (all) major developments should contribute to the greening of Sandwell by delivering against its listed criteria.
Part 3) of the Policy has a prescriptive approach and as such lacks the flexibility needed (and provided in the first two parts of the Policy), and is likely to impact upon deliverability of development – particularly allocated brownfield sites which are subject to other policy requirements and masterplan aspirations which, if also inflexibly applied, will continue to stifle the development anticipated from them. The Policy also needs to recognise that development must be viable in order to deliver any of its requirements.
As such, the Part 3) of the Policy must be amended to provide sufficient flexibility to ensure that development is viable, and ultimately deliverable, whilst delivering its requirements “where appropriate”, including where viable. In this regard, Part 3) should reflect Parts 1) and 2) of the
Policy.
This more flexible approach is also provided in draft Policy SH04 (which says “Developments of ten homes or more should, where financially viable, provide a range of tenures…”) for example, which makes it clear, and is explicit, that affordable housing provision is required but only “where financially viable”.
It is welcome that Draft Policy SDM1 (Design Quality) part 1) requires developments to address its listed criteria “where appropriate” and has some flexibility in this regard.
Similarly, Part 2 of the draft Policy requires development proposals to demonstrate that its listed Guidance has been considered and “where appropriate” used to inform design and access statements that reflect their Sandwell-specific context, and also has some flexibility in this
regard.
However, at part 3) the policy requires (all) major developments should contribute to the greening of Sandwell by delivering against its listed criteria.
Part 3) of the Policy has a prescriptive approach and as such lacks the flexibility needed (and provided in the first two parts of the Policy), and is likely to impact upon deliverability of development – particularly allocated brownfield sites which are subject to other policy requirements and masterplan aspirations which, if also inflexibly applied, will continue to stifle the development anticipated from them. The Policy also needs to recognise that development must be viable in order to deliver any of its requirements.
As such, the Part 3) of the Policy must be amended to provide sufficient flexibility to ensure that development is viable, and ultimately deliverable, whilst delivering its requirements “where appropriate”, including where viable. In this regard, Part 3) should reflect Parts 1) and 2) of the
Policy.
This more flexible approach is also provided in draft Policy SH04 (which says “Developments of ten homes or more should, where financially viable, provide a range of tenures…”) for example, which makes it clear, and is explicit, that affordable housing provision is required but only “where financially viable”.
Support
Sandwell Local Plan - Reg 19 Publication
Representation ID: 1503
Received: 11/11/2024
Respondent: Police and Crime Commissioner for West Midlands (PCCWM)
Agent: The Tyler Parkes Partnership Ltd
The PCCWM supports the wording in Policy SDM1 as it reflects the representations made to the Sandwell Issues and Options consultation and the Reg 18 consultation and now includes the requirement that the need for new development must not cause an adverse impact on the living environment of occupiers of existing residential properties, or unacceptable living conditions for future occupiers of new residential properties, in terms of crime and safety., and at 2d. that “Development proposals must demonstrate that the following guidance has been considered and where appropriate used to inform design and access statements that reflect their Sandwell-specific context:… d. compliance with crime prevention measures, such as Secured by Design and / or Park Mark principles;”
Sandwell Spatial Portrait – paragraphs 47-50, Challenges and Issues – paragraph 89, and Chapter 1 – Sandwell 2041: Spatial Vision, Priorities and Objectives
The PCCWM supports the inclusion of detailed crime statistics and the predicted increase in crime with the additional growth proposed but has updated statistics available and therefore request that those paragraphs be amended as set out below to reflect up to date figures. Paragraphs 47 and 48 appear to quote crime statistic figures from a source other than West Midlands Police, and it is respectfully suggested that a consistency of figures, and their
source, should be used to ensure that future comparisons are consistent and accurate.
Since the submission of previous representations on behalf of the PCCWM, and in particular our response to the Infrastructure Delivery Plan dated 26 September 2023 (see Appendix 3) we have been provided with updated figures which reflect the full 2023 calendar year. These are provided at Appendix 4, but for the purposes of the table at Paragraph 49 and the subsequent Paragraph 50, the following amendments should be made in order to update the figures to reflect the most up to date full year statistics:
“49. West Midlands Police (WMP) have also identified an indicative level of crime in Sandwell, taken from the ONS and their own crime figures (offences / incidents /calls) for 2023:
See the attachment for table
50. According to WMP, the proposed numbers of new homes (10,434) would represent an 8% increase in the number of households within Sandwell. If the same percentage increase is applied to the actual incident and crime statistics for the area, the predicted proportional additional and total incidents / crimes likely to occur within a calendar year is likely to be in the order of 7,000 additional calls for service and 3,000 additional offences.”
Notwithstanding the above, PCCWM objects to the lack of reference to preventing crime and disorder in the draft Local Plan’s Challenges and Issues. These are clearly set out in the Arup ‘Infrastructure Delivery Plan Part 1: Infrastructure Needs Assessment Reference: v2.0 dated 2nd November 2023’ (section 4.4.3: Infrastructure Implications of Future Growth - Policing’): -
• Sandwell has seen a 25% increase in recorded crime since 2020;
• The demands placed on the police service can increase as the local population increases;
• The demands on the police are exacerbated by the major changes in the nature of crime and methods needed to deal with it, particularly regarding cybercrime, child sex exploitation and terrorism;
• Based on analysis of West Midlands Police’s (WMP) crime statistics (2022), it is predicted that the rising population would require the recruitment of c120 extra staff members;
• As Sandwell’s population increases, there is a greater need to ensure new development is supported by adequate policing infrastructure in the interest of
creating sustainable communities;
• This highlights the importance of new developments employing Secured by Design principles to reduce the amount of additional crime generated as the population grows in certain areas;
• As only 20% of their funding is received from Council Tax precept, WMP have stressed that increases in local population does not directly lead to an increase in funding for the Police Service from Government; and • WMP consider the consequence of no additional funding will lead to existing infrastructure becoming severely stretched and thereby have a severe adverse impact on the quality of the service that could be delivered.
As Sandwell’s population increases, there is a greater need to ensure new development is supported by adequate policing infrastructure in the interest of creating sustainable communities. With the predicted increase in crime in the Borough as a result of the proposed growth and the implications thereof as set out in the Spatial Portrait and the Part 1: Infrastructure Needs Assessment, it is inconsistent for this not to be referenced in the Challenges and Issues.
The PCCWM objects to bullet 89f) ‘Providing infrastructure to support growth’, which should be more explicit to include emergency services infrastructure particularly as Ambition 5 of Chapter 1 – ‘Sandwell 2041: Spatial Vision, Priorities and Objectives’ states: –
“Ambition 5
Our communities are built on mutual respect and taking care of each other, supported by all the agencies that ensure we feel safe and protected in our homes and local SLP relevance:
• promoting the development and improvement of attractive, safe and accessible public realm, support services and community infrastructure as part of new development and project delivery.”
This ambition should be linked to a ‘Challenge and Issue’ as other ‘Ambitions’ are.
In accordance with national planning policy, the theme of community safety and crime prevention should be given greater prominence in the ‘Spatial Portrait’, ‘Challenges and Issues’ and Chapter 1 – Sandwell 2041: Spatial Vision, Priorities and Objectives of the draft Reg 19 Sandwell Local Plan consultation, to promote improvements in community safety, reducing crime, fear of crime and anti-social behaviour, which are vital objectives in the
context of creating sustainable communities.
Chapter 3 – Framework Policies
Policy SDS1 ‘Spatial Strategy for Sandwell’
The PCCWM objects to Spatial Strategy (Policy SDS1), which provides the overarching strategy for Sandwell and sets out the broad scale and distribution of new development for the Plan period to 2041, because it fails to clearly specify what is meant by sufficient infrastructure to be delivered to meet identified requirements to ensure that the required levels of development are sustainable and it makes no reference to the requirement for planning proposals to address crime and safety.
The PCCWM works in the community and is a key Council partner and a key stakeholder in the Borough. As the overarching policy, it is of vital importance that Policy SDS1 specifies that development should provide the necessary emergency services infrastructure, and maximise safety, crime prevention and reducing fear of crime.
The PCCWM requests that the policy be amended at 1c) by adding ‘…including police and emergency infrastructure’ and in Part 2 by a new point ‘…ensuring all new development maximises safety, reduces crime and the fear of crime’.
Policy SDS5 ‘Achieving Well-designed Places’
The PCCWM supports Policy SDS5 which states at 9 that “To support the development of safe neighbourhoods, ensure quality of life and community cohesion are not undermined and minimise the fear of crime, the design of new development should create secure and accessible environments where opportunities for crime and disorder are reduced or designed out.” This policy recognises the importance of safety in terms of environmental,
economic and social benefits - at 3.70 “The importance of high-quality design in creating places where people want to live, work and invest with renewed confidence is a fundamental aspect of both national and local policy. Designing high quality places will result in environmental, economic and social benefits, including inter alia a) community safety…” – but this recognition is missing from the overarching policies and vision, as set out above.
Policy SDS6 ‘Cultural Facilities and the Visitor Economy’
The PCCWM supports the wording of the policy and justification to Policy SDS6 - Cultural Facilities and the Visitor Economy, which reflects the representations made to the Sandwell Issues and Options consultation and the Regulation 18 consultation.
Chapter 4 – Sandwell’s Nature and Historic Environment
Policy SNE6 – Canals
The PCCWM supports the inclusion of subclauses 3e. and 3f, further to earlier representations where the PCCWM requested reference to the need to consider crime, antisocial behaviour, and the fear of crime when considering development proposals on the canal network. The success of the policy will to some extent be dependent upon people being and feeling safe and therefore the additional clauses are supported.
Chapter 6 – Health and Wellbeing in Sandwell
Policy SHW1 – Health Impact Assessments and Policy SHW2 Healthcare Infrastructure
The PCCWM supports Policy SHW1 and its objectives, noting the Council’s acknowledgement (in the preamble to polices on health and wellbeing, e.g. paragraph 6.6) of “Providing an environment that contributes to people’s health and wellbeing is a key objective of the Council and its partners in the health, voluntary and related sectors.” and that the proposed Health Impact Assessments (HIA) should address, where relevant, how the proposed development: a) is inclusive, safe, and attractive, with a strong sense of place, encourages social interaction and provides for all age groups and abilities’ (paragraph 6.14).
However, whilst it is also noted that Policy SHW2 – Healthcare Infrastructure requires an assessment of proposals for major residential developments of ten units or more to be assessed against the capacity of existing healthcare facilities and / or services to support that development, the PCCWM objects to the omission of a similar policy requirement for developer contributions to police and emergency infrastructure which is acknowledged in the draft Local Plan has additional demands placed upon it from residential and other development.
Policy SHW2 (and its justification) could be expanded to include the need for other social infrastructure in such instances, for example
‘Policy SHW2 – Healthcare, wellbeing and safety infrastructure…
3. Proposals for major residential developments of ten units or more must be assessed against the capacity of existing healthcare facilities and other services that contribute to community wellbeing and safety such as police and emergency services infrastructure as set out in local development documents. Where the demand generated by the residents of the new development would have unacceptable impacts upon the capacity of these
facilities, developers will be required to contribute to the provision or improvement of such services, in line with the requirements and calculation methods set out in local development documents…
5. In the first instance, infrastructure contributions will be sought to deal with relevant issues on the site or in its immediate vicinity. Where this is not possible, however, any contribution will be used to support offsite provision of healthcare infrastructure and other services that contribute to community wellbeing and safety.’
Policy SHW4 – Open Space and Recreation
The PCCWM supports this policy which requires development proposals to focus on supporting / delivering the following functions of open space in Sandwell, which includes at 8e. increasing surveillance and enhancing public perceptions of safety.
Chapter 7 – Sandwell’s Housing
Policy SH01 – Delivering Sustainable Housing Growth
The PCCWM objects to this policy. In terms of the Housing Allocations referred to in point 2 (and as set out in Appendix B Sandwell Site Allocations – table of ‘Housing Allocations’), while the PCCWM supports the following housing allocations –
See attachment for table
However, whilst both of these sites are marked for housing development on the Reg 19 Sandwell Local Plan Policies Map, neither are indicated for housing development on the Council’s ‘Interactive Map’. The PCCWM objects to these apparent omissions. Furthermore, the anticipated delivery timescales set out in Appendix B ‘Housing Allocations’ table are considered to be too long. Both sites are currently on the market, and it is envisaged that would be able to be completed within 5 years.
The PCCWM objects to the omission of 2no. sites that were submitted through the Council’s Call for Sites at the same time as those that have been allocated and requests their inclusion in the Housing Allocations, particularly considering the Council’s shortfall in housing land.
These are as follows: -
1) Smethwick Police Station, Piddock Road, Smethwick
This site is identified as Site SH65 in Appendices E and H of the Reg 19 Sustainability Appraisal of the draft Sandwell Local Plan. In Appendix H (as shown below), the site is marked as ‘Selected for Housing’ –
In addition, the site is marked for housing development on the Reg 19 Sandwell Local Plan Policies Map (although not on the Council’s ‘Interactive Map’).
Although this omission would appear to be a minor error, and the PCCWM objects to it. Therefore, the PCCWM requests that this site be shown to be allocated for housing development under Policy SHO1and Appendix B to the Reg 19 draft Sandwell Local Plan.
2) Oldbury Police Station, Oldbury Ringway, Oldbury
This 1,000sqm site was submitted to the Council through the Call for Sites process but is not included in the Reg 19 draft Sandwell Local Plan or the Reg 19 Sustainability Appraisal of the draft Sandwell Local Plan. The PCCWM objects to the omission of consideration of this sustainably located, brownfield site is an error that should be corrected.
The details of the site are set out again below: -
See attachment
In terms of the wording of Policy SHO1, whilst point 4 to the policy states that ‘The development of sites for housing should demonstrate a comprehensive approach, making best use of available land and infrastructure and not prejudicing neighbouring uses’ ; and at point 5 that ‘Ancillary uses appropriate for residential areas, such as health facilities, community facilities and local shops, may be acceptable where there is a gap in service provision and where they can be integrated successfully into the residential environment. Other uses will not be acceptable on these sites.’
However, the Policy SHO1 makes no reference of the requirement that in order to sustain the level of growth proposed in the draft Sandwell Local Plan consultation and to meet the national and local policy objectives relating to safety and security, contributions will be required through CIL/ S.106 agreements to help fund the provision and maintenance of Police services to create environments where crime and disorder and the fear of crime do
not undermine the quality of life or social cohesion.
Accordingly, the PCCWM objects to Policy SHO1 as it should include reference for the need for contributions for all social, environmental and physical infrastructure to support sustainable housing growth in accordance with the aspirations of the policy and the plan. Therefore, new development, including all housing sites/ housing allocations, should be subject to CIL/ S.106 agreements as appropriate to help fund the provision and maintenance of Police services, and the requirement for this infrastructure should be enshrined in the wording of Policy SHO1.
Policy SH02 – Windfall Developments
The PCCWM objects to Policy SHO2, as it should include reference for the need for contributions for social, environmental and physical infrastructure to support windfall development. Windfall development, as well as development on larger sites/ allocations, should be subject to CIL/ S.106 agreements to help fund the provision and maintenance of Police services, and the requirement for this infrastructure should be enshrined in the wording of Policy SHO2.
Policy SH07 - Houses in Multiple Occupation
The PCCWM supports the wording of the policy and justification to Policy SHO7, which reflects the representations made to the Sandwell Issues and Options consultation and the Regulation 18 consultation.
The PCCWM supports the specific reference within the policy itself, point 3(e) as follows: - ‘3. Once the current level of HMO provision has been established in a relevant area, the following criteria will be applied to a new proposal: …
e) the development would not give rise to unacceptable adverse cumulative impacts on amenity, character, appearance, security, crime, anti-social behaviour or the fear of crime.’
The PCCWM also fully supports the footnote to this policy (174) which recommends that pre-application and planning application advice is sought for HMO proposals from the West Midlands Police Design Out Crime Officers.
In addition, the PCCWM supports the reference in point 6 of the Policy that states that the policy criteria will also apply to the intensification or expansion of an existing HMO.
The justification to Policy SHO7, paragraph 7.54(g) is also supported by the PCCWM. It explains that harmful impacts associated with high numbers of HMOs can include: ‘…g) increased anti-social behaviour and fear of crime resulting from the lifestyles of some HMO occupants, the transient nature of the accommodation and inadequately designed / maintained properties;’
However, in addition to the support for Policy SHO7, it is noted that the Council acknowledge (para 7.57) that: ‘Whilst this type of accommodation [HMO] can address certain housing needs, HMOs tend to be grouped together in parts of the urban area, becoming the dominant type of housing, which can lead to social and environmental problems for local communities. Alongside this, an over-concentration of HMO properties can lead to a loss of family-sized units. This in turn can lead to a consequential increase in the overall number of units unsuited to family occupation. This can pose a serious issue for
maintaining a mixed sustainable housing offer across the Black Country.’ In light of these concerns, the PCCWM recommends a Borough wide Article 4 Direction be introduced to seek to remove the permitted development right to convert a residential dwelling to a small HMO (providing living accommodation for 3 to 6 unrelated persons), such that planning permission would be required for any proposals, alongside the proposed policy against which all HMO applications, as well as planning applications for large HMO (for which there are no permitted development rights and thereby planning permission is required) will be assessed. This is an approach taken elsewhere, including in neighbouring Birmingham.
An Article 4 Direction regarding permitted development for HMOs, alongside the proposed policies of the Reg 19 draft Sandwell Local Plan would manage the distribution and delivery of HMOs, to reduce the potential harm that arises from the over-concentration and poor quality of HMOs, and the consequential impact this has on crime and disorder and to community safety, and the increased pressure this places on Police resources.
Policy SH09 - Accommodation for Gypsies and Travellers and Travelling Show people
The PCCWM supports the wording of the policy and justification to Policy SHO9, which reflects the representations made to the Sandwell Issues and Options consultation and the Reg 18 consultation
Chapter 9 – Sandwell’s Centres
Policy SCE1 - Sandwell Centres
The PCCWM supports the wording in Policy SCE1 ‘Sandwell’s Centres’ at 6(d), as this reflects the representations made to the Sandwell Issues and Options consultation and the Reg 18 consultation. ‘6. A land use approach will be adopted to encourage regeneration and to meet the challenges facing Sandwell's centres, particularly as little retail capacity has been identified to support additional floorspace, through supporting:
“…d. a variety of facilities, appealing to a wide range of age and social groups, provided in such a way to ensure a safe, accessible and inclusive environment and any anti-social behaviour is discouraged, for example through management, improved lighting and CCTV coverage where appropriate.’
Policy SCE2 - Non-E Class Uses in Town Centres
The PCCWM supports the wording in Policy SCE2 as this reflects the representations made to the Sandwell Issues and Options consultation and the Reg 18 consultation, specifically the addition to the policy of clause 5: ‘5. In all areas of Town Centres, it is important that a variety of facilities, appealing to a wide range of age and social groups, are offered and that these are provided in such a way to ensure a safe, accessible and inclusive environment and any anti-social behaviour is discouraged, for example through management, improved lighting and CCTV coverage where appropriate.’
Policies SCE3, SCE4 and SCE5
The PCCWM supports the inclusion of the following wording in each of these policies – namely ‘In determining planning applications for new development or changes of use in local centres, the Council will consider any issues concerning community safety, crime, and disorder and will, where necessary, seek advice from the police and other safety organisations.’
Comments on Chapter 10 – West Bromwich
Policy SWB2 - Development in West Bromwich
The PCCWM supports the proposed changes to this policy as it does now cross references other relevant policies of note, including those relating to town centres, e.g. Policy SCE1 ‘Sandwell Centres’, and point 4 references the amended Policy SDS5 ‘Achieving Welldesigned Places’
Comments on Chapter 15 – Development Management
Policy SDM1 – Design Quality
The PCCWM supports the wording in Policy SDM1 as it reflects the representations made to the Sandwell Issues and Options consultation and the Reg 18 consultation and now includes the requirement that the need for new development must not cause an adverse impact on the living environment of occupiers of existing residential properties, or unacceptable living conditions for future occupiers of new residential properties, in terms of crime and safety., and at 2d. that “Development proposals must demonstrate that the following guidance has been considered and where appropriate used to inform design and access statements that reflect their Sandwell-specific context:… d. compliance with crime prevention measures, such as Secured by Design and / or Park Mark principles;”
Policy SDM6 – Hot Food Takeaways and SDM7 - Management of Hot Food Takeaways
The PCCWM acknowledges the wording in Policy SDM6 – Hot Food Takeaways. However, whilst associated Policy SDM7 ‘Management of Hot Food Takeaways’ has been amended as requested in the PCCWM’s Regulation 18 consultation response (new clause 9) However, the PCCWM remains of the view that Policies SDM6 and SDM7 should be amalgamated into one policy as the inference is that if a proposal complies with the prescriptive and numerical thresholds under Policy SDM6 it will be acceptable, even though it at may not meet the criteria set out in Policy SDM7 – Management of Hot Food Takeaways – and vice versa. Accordingly, the PCCWM objects on the basis that Policies SDM6 and SDM7 should be amalgamated since it is considered that the criteria in Policy SDM7 to be equally important in the consideration of a planning application for a hot food takeaway, particularly as hot food takeaways are often a flashpoint for violence after pubs and clubs close.
Policy SDM8 - Gambling Activities and Alternative Financial Services
The PCCWM supports Policy SDM8 Gambling Activities and Alternative Financial Services and particularly Point 6 referring to community safety, crime and disorder etc.
Policy SDM9 – Community Facilities
The PCCWM supports the wording in Policy SDM9 ‘Community Facilities’ as new point 7 of the policy reflects the representations made to the Sandwell Issues and Options consultation and the Reg 18 consultation and footnote 281 correctly refers to the definition of community facilities in the NPPF (December 2023) paragraph 97a.
Comments on Chapter 12 - Infrastructure and Delivery
The PCCWM objects to Chapter 12 of the draft Reg 19 Sandwell Local Plan, and specifically Policy SID1 – Infrastructure Provision and Viability Assessments.
This chapter sets out the infrastructure the Council consider is needed to ensure the effective delivery of the proposed scale of the development envisaged. Paragraph 12.1 acknowledges that ‘Ensuring effective delivery of this amount of development [10,434 new houses and 1,221ha of employment land up to 2041] will require strong collaborative working with public, private and third sector partners, involving a robust process of
infrastructure planning and delivery’. However, as with the Reg 18 draft Local Plan, the policies in the Reg 19 draft Local Plan do not reflect police and emergency services provision as infrastructure investment required to support that development.
On behalf of the PCCWM, repeated submissions have been made, setting out in full, the evidenced case for new development to contribute to police infrastructure, in our written submissions to:
• Issues and Options Consultation – letter dated 17 March 2023.
• Infrastructure Delivery Plan (IDP) – letter dated 26 September 2023.
• Preferred Options Consultation – letter dated 15 December 2023.
It is especially disappointing that having been invited to engage fully with ARUP, who assisted the Council in preparing Part 1 of the IDP, which included a meeting with ARUP on 1 September 2023, we were not invited to engage further and not afforded the opportunity to represent the PCCWM in the preparation of Part 2 of the IDP (i.e. the Infrastructure Schedule), within which the only commentary made regarding West Midlands Police reads:
“The response from West Midlands Police to the Regulation 18 Local Plan Consultation reiterated many of the sentiments expressed during engagement from Part 1 of the IDP – highlighting an apparent need for more policing resources and suggesting a formula for calculating developer contributions. However, no specific physical infrastructure has been specified.”
This approach is wholly unsatisfactory and simply ignores the fully evidenced justification provided. Put simply, new development will place a greater strain on the Police and therefore the suggested mitigation is entirely justified.
It is accepted and clear that growth during the plan period will inevitably have implications for the maintenance of safety and security in the Borough and there will clearly be a need for additional and/or enhanced Police infrastructure.
Policy SDS1 ‘Development Strategy’ which provides the overarching spatial strategy for Sandwell, sets out the scale and distribution of new development for the Plan period to 2041 and confirms at point (1) ‘To support the attainment of the Sandwell SLP Vision, drive sustainable and strategic economic and housing growth and meet local aspirations, Sandwell, working with local communities, partners and key stakeholders, will make sure that decisions on planning proposals:…c. ensure that sufficient physical, social, and environmental infrastructure is delivered to meet identified requirements’.
The inclusion of the police and emergency services provision as infrastructure required to support development is compatible with legislation and national planning policy, as follows:
Section 17 of the Crime and Disorder Act 1998 states, ‘Without prejudice to any other obligation imposed on it, it shall be the duty of each authority to which this section applies to exercise its various functions with due regard to the likely effect of the exercise of those functions on, and the need to do all that it reasonably can to prevent, crime and disorder in its area’. The PCCWM therefore has a statutory duty to secure the maintenance of an efficient and effective police force for the area. Sandwell Council is also statutorily required to consider crime and disorder and community safety in the exercise of its duties with the aim of achieving a reduction in crime.
The NPPF, December 2023, Paragraph 2 states that the NPPF must be taken into account in preparing the development plan and is a material consideration in planning decisions. Planning policies and decisions must also reflect relevant international obligations and statutory requirements.
Paragraph 7 of the NPPF explains that the purpose of the planning system is to contribute to the achievement of sustainable development and Paragraph 8 confirms that achieving sustainable development means that the planning system has three overarching objectives: an economic, a social and an environmental objective. These objectives include supporting strong, vibrant and healthy communities by ensuring that a sufficient number and range of
homes can be provided to meet the needs of present and future generations; and by fostering a well-designed and safe built environment.
Paragraph 20 of the NPPF includes, inter alia, a requirement for policies to deliver sufficient provision for infrastructure, including those related to security, with paragraphs 16 and 26 indicating that this could be delivered through joint working with all partners concerned with new development proposals.
Section 8 of the NPPF ‘Promoting health and safe communities’, Paragraph 96, identifies that planning policies and decisions should aim to achieve healthy, inclusive and safe places which are safe and accessible, so that crime and disorder and the fear of crime, do not undermine the quality of life or community cohesion.
Paragraph 135 (f) of the NPPF calls for the creation of safe places where, inter alia, crime and disorder, and the fear of crime, do not undermine the quality of life or community cohesion and resilience.
Annex 2 (NPPF) identifies the police as ‘Essential local workers’, defined as ‘Public sector employees who provide frontline services in areas including health, education and community safety – such as NHS staff, teachers, police, firefighters and military personnel, social care and childcare workers.
It is also especially noteworthy that Part 10A Infrastructure Levy: England of the Levelling Up and Regeneration Act 2023 (LURA) confirms at Section 204N (3) relating to Infrastructure Levy regulations that ‘infrastructure’ includes ‘(h) facilities and equipment for emergency and rescue services. Whilst the LURA appears unlikely to advance in the same manner as was envisaged by the previous Government, there is a clear recognition that infrastructure
for the emergency services, which would obviously include Police, should be recognised. It is also particularly noteworthy that given the comments made by ARUP at Part 2 of the Infrastructure Delivery Plan (as referred to above), such infrastructure would include both facilities AND equipment.
It should also be noted that it is the case that increases in local population and the number of households do not directly lead to an increase in funding for WMP from Central Government. It is therefore necessary to secure CIL and/or S.106 contributions for infrastructure due to the direct link between the increased demand for police services and changes in the physical environment due to new housing and economic growth, which have permanent impacts on future policing and demands upon WMP. Securing contributions towards policing enables the same level of service to be provided to residents of new developments, without compromising the existing level of service for existing communities and frontline services. Put simply, the consequence of no additional funding is that existing infrastructure will become severely stretched and thereby have a severe adverse impact on
the quality of the service that WMP are able to deliver.
The High Court judgement of Mr Justice Foskett in The Queen and Blaby DC and Others [2014] EWHC 1719 (Admin) at Appendix 1 is a clear example of the case for S106/CIL contributions towards Police infrastructure. In that case, a development of 4,250 dwellings, community and retail development, schools and leisure facilities was proposed, the judgement reads:
‘It is obvious that a development of the nature described would place additional and increased burdens on local health, education and other services including the police force.’ (Para 11).
The judgement goes on to comment that:
‘Those who, in due course, purchase properties on this development, who bring up children there and who wish to go about their daily life in a safe environment, will want to know that the police service can operate efficiently and effectively in the area. That would plainly be the “consumer view” of the issue.’ (Para 61).
‘I am inclined to the view that if a survey of local opinion was taken, concerns would be expressed if it were thought that the developers were not going to provide the police with a sufficient contribution to its funding requirements to meet the demands of policing the new area.’ (Para 62).
To ensure that levels of service can be maintained for both existing and future residents in the wider Sandwell Borough area, developer contributions through the mechanism of CIL and/or S.106 Obligations for Police infrastructure are considered essential.
It is the case that, Planning and S78 Appeal decisions (Appendix 2) have long recognised that the infrastructure requirements of the Police are perfectly eligible for consideration and can be allocated financial contributions through S106 Obligations which accompany qualifying planning permissions for major development (residential and commercial alike), with the Planning Inspector in PINS appeal reference APP/X2410/A12/2173673) stating that:
‘Adequate policing is so fundamental to the concept of sustainable communities that I can see no reason, in principle, why it should be excluded from purview of S106 financial contributions…’
To achieve sustainable development, as required by the NPPF and PPG, the necessary supporting infrastructure must be identified through proactive engagement between the Council and the infrastructure providers, including the WMP. Infrastructure needs and costs arising as a result of the proposed growth in the draft Sandwell Local Plan should be included in the Infrastructure Delivery Plan (IDP) – and representations have already been
made by the PCCWM in this regard - and Viability and Delivery Study and specific 20/22 requirements should be clearly set out in the individual site allocation policies and/or accompanying masterplans, Area Action Plans (AAPs) or Supplementary Planning Documents (SPDs), to ensure that developers are aware of their obligations at the outset. In addition, as the primary document for planning decisions, the draft Sandwell Local Plan must also address the need for sustainable safe developments supported by essential infrastructure including Police infrastructure.
There also needs to be wording in relevant policies to require this, to ensure that developers are aware of the importance attached to issues of crime and
safety by Sandwell MBC, as well as the need to maintain an appropriate level of community infrastructure and Emergency Services infrastructure.
The definition and support for infrastructure should be explicitly set out in the draft Local Plan, to meet national and local policy objectives relating to safety and security, and it should be clearly set out that contributions will be required through CIL/ S.106 agreements to help fund the provision and maintenance of facilities and equipment for Police services, in order to sustain the level of growth proposed in the draft Local Plan.
There are numerous examples of adopted planning policies in Local Plans which have been found sound after examination, which specifically refer to police infrastructure provision and contributions.
At the time of the Police’s representations to the Draft Black Country Plan Consultation (Regulation 18), it was noted that there was inclusion in the Viability and Delivery Study of an indicative contribution of £43.00 per dwelling towards the funding gap in Police infrastructure from the need for additional services arising directly from the proposed scale of growth. This was welcomed and the need for financial contributions in the form of
CIL/S106 needs to be taken forward into policy, as well as the contribution figure needing to be increased/ linked to inflation.
Harm will result if West Midlands Police do not have the necessary funding to maintain an appropriate level of service for existing and for future residents, work and visitors within Sandwell (and surrounding areas) and therefore it is imperative that the draft Sandwell Local Plan addresses the need for sustainable safe developments supported by essential infrastructure.
The accompanying Infrastructure Delivery Plan (IDP) should be regarded as integral to the local plan process with a commitment given to ensuring that it is maintained as a ‘live document’ throughout the plan period.
As with many publicly funded services, Police forces within England have seen significant reductions in resources since 2010 due to reduced budgets. During this period, WMP has seen real terms funding reductions of in excess around 22% before taking into account the police officer uplift programme. As a result, the PCCWM has adopted a continuing programme of budgetary reductions, which in turn has had implications for operational pressures, against a backdrop of continued development (and in particular housing) growth within the WMP Force area.
Changes in general population do not increase the overall funding made available to WMP through Central Government grant. Even if there were to be an increase in funding because of development growth, such funding would be fully utilised in contributing to additional salary, revenue and maintenance costs (i.e. not capital costs). That being the case, such funding would not be available to fund the infrastructure costs that are essential to support
significant new development growth during the Plan Period.
Full details of Police funding requirements are set out in the previous PCCWM representations (Appendix 3), as reported in the Sandwell Infrastructure Delivery Plan Part
1: Infrastructure Needs Assessment, November 2023. These funding requirements have since been updated to reflect the latest full year (2023) statistics (Appendix 4). It should be noted that these latest figures supersede all previous versions, including the aforementioned indicative contribution provided during the Black Country Plan Consultation.
In order to meet the national policy objectives of ensuring safety, reducing crime and the fear of crime, it is vital that the Police are not under-resourced or deprived of legitimate sources of funding. The aim is to deploy additional staffing and additional infrastructure to cover the demand from new development at the same level as the policing delivered to existing households. Hence, additional development would generate a requirement for additional staff and additional personal equipment (such as workstations, radios, protective clothing, uniforms and bespoke training), police vehicles of varying types and functions.
If additional policing infrastructure is not provided, future growth in Sandwell will seriously impact on the ability of the Police to provide a safe and appropriate level of service and to respond to the needs of the local community. That outcome would be contrary to national policy.
Without this, the PCCWM objects to the Regulation 19 draft Sandwell Local Plan. As the statutory Development Plan, it is the purpose of the draft Sandwell Local Plan to confirm the types of infrastructure which will be required to provide sustainable development in the Borough during the plan period and a new policy should be drafted accordingly.
Comments on the Glossary
The PCCWM supports the inclusion of a definition of Secured by Design and Park Mark in the Glossary.
The PCCWM would be grateful if you could reflect on the objections set out in these representations prior to submission of the local plan. Without their inclusion the PCCWM considers the plan would not be sound nor fully reflect national planning policy.
Object
Sandwell Local Plan - Reg 19 Publication
Representation ID: 1542
Received: 11/11/2024
Respondent: Home Builders Federation
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
100. HBF are supportive of the use of ‘Building for a Healthy Life’ as best practice guidance but suggest its use should remain voluntary rather than becoming a mandatory policy requirement. Building for a Healthy Life is not really a ‘standard’ to be achieved, but rather a toolkit for considering design and thinking about the qualities of successful places.
The Plan is not considered to be sound as it is not justified or effective or in line with national policy.
4. HBF welcomes the Council’s efforts to ensure that they have an up to Local Plan. Plan-making is a fundamental part of a Local Authority’s role and is essential to support the delivery new homes and jobs. HBF agree that there are many factors that support the need for a new Local Plan for Sandwell. However, HBF note that the Plan Period runs only to 2041. Para 22 of the NPPF requires that ‘strategic policies should look ahead over a minimum 15-year period from adoption’.
5. Although we note that the Plan is now at Reg 19 submission stage, it can and does take time to proceed through the remaining stages of plan preparation- the examination process, main modification consultation, Inspector’s report and adoption of the Local Plan. HBF therefore question whether the plan period need extending. Extending the plan period by one or two years and rolling forward the housing requirement to these future years would seem a reasonable approach to address this issue. The supporting evidence would probably need to reflect this longer timeframe too.
6. HBF suggest that for this plan to be sound, the plan period needs extending. A plan period of less than 15 years on adoption fails to comply with the NPPF requirements for effective plan making.
Duty to Co-operate
7. HBF note that a Duty to Cooperate Statement dated Sept 2024 has been prepared, https://www.sandwell.gov.uk/downloads/file/3267/slp-reg-19-duty-to-co-operate-statement but that is not included on the Reg 19 consultation website https://sandwell.oc2.uk/ and has to be searched for separately on the Council’s website, as does the consultation statement and other supporting documentation.
8. Table 2 of the DTC statement sets out the Statements of Common Ground in relation to the apportionment of contributions between the four Black Country LPAs and the apportionment of contributions between the Greater Birmingham and Black Country Housing Market Area and an agreement to refresh the Housing Growth Study remain in discussion. As does the SoCG about Telford and Wrekin council making a housing land contribution.
9. HBF therefore remain unclear if the Duty to Cooperate has been met. Although we welcome the DTC Statement, which we requested in our Reg 18 response, the current position of nieghbouring authorities in relation to Sandwell’s Local Plan remains unclear. HBF agree that meeting unmet housing need was one of the main strategic matters being addressed through the Black Country Plan and as such continues to be one of the principal cross-boundary issues to be addressed in the preparation of the Sandwell Local Plan.
Problems with the Shropshire Local Plan EIP
10. Table 2 of the DTC statement states that a SoCG has been drafted and agreed with Shropshire Council. However, HBF note that Inspectors of the Shropshire Local Plan have recently written to Shropshire Council expressing significant concerns about the soundness of their Plan and the planned future EIP hearing sessions on the Shropshire Plan have been cancelled. See https://www.shropshire.gov.uk/planning-policy/local-planning/local-plan-review/draft-shropshire-local-plan-2016-2038-examination/examination-calendar/ and https://www.shropshire.gov.uk/media/29185/id46-stage-2-hearings-holding-letter.pdf
11. This would seem to raise questions around the soundness of the Sandwell Plan if this Plan is seeking to rely on Shropshire delivering housing to meet some of Sandwell’s unmet need.
12. HBF would be keen to understand the Council’s view on the implication of this latest development in the Shropshire Local Plan EIP on the Duty to Cooperate in relation to Sandwell’s Plan. What conversations have been undertaking during, and subsequent to, the Shropshire EIP soundness issues coming to light? At the very least the DTC statement will need updating to reflect the current position. Without this information being publicly available at this point in time HBF are unable to fully assess the impact of this issue on compliance with the Duty to Cooperate.
13. HBF’s main concerns around Duty to Cooperate continue to relate to ensuring that Sandwell’s required amount of housing is delivered in reality. This is particularly important because the current Plan the indicates a significant amount of unmet need. The issue of fully meeting housing needs within Sandwell remains. Our more detailed comments on this issue can be found in response to Policy SDS1.
Vision for Sandwell
The Vision is not considered to be sound as it is not justified or effective or in line with national policy.
14. The Vision is very long and imprecise, similarly the Plan’s objectives are very numerous. HBF question if this is effective.
15. Although HBF support has supports the need for the Vision for Sandwell to include reference to the need for new homes to meet housing need, as included within Ambition 7 we suggest this should be amended to be more explicit about the requirement to meet the development needs of the area. HBF would suggest that both the Vision and Objective Six should be more explicit about the need to plan for both open market and affordable housing to meet housing needs and support the Council’s growth aspirations.
Planning for Sustainable Development
Policy SD1: Overall Development Strategy
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
Housing Requirement- dpa and total
16. The Reg 18 version of the Plan proposed at least 11,167 net new homes and at least 1,206ha of employment land (of which 29ha is currently vacant). The Reg 19 version of the Plan reduces the Housing Requirements to 10,434 net new homes.
17. It is noted that paragraph 2.6 explains that “There is still, despite the number of housing sites that have been identified and allocated, a shortfall in the numbers of houses that need to be built to meet identified needs. Housing need is calculated using the Government’s standard method based on household growth projections.
• Sandwell needs to identify land for 26,350 homes by 2041.
• The supply of suitable residential land based on the most recent evidence stands at 10,434 homes.
• There is an unmet need for 15,916 homes.!
18. This means that the council is planning only to meet 40% of their proposed housing number, with 60% not being planned for. HBF believe the housing requirement should be higher to start with and so the percentage of unmet need would be even higher. Even, setting this aside for now, HBF is very concerned about this proposed shortfall. Failure to meet the housing needs of Sandwell will inhibit growth and do nothing to address the current housing crisis, with implications for the economy and population of wider region. It will be important for the Council to clearly show how the unmet need will be met, and what they will do to ensure that it is. However, the Council needs to first establish the appropriate housing requirement for Sandwell before considering if and how this could be met.
19. The Reg 18 version of the Plan sought to plan for 187 ha of employment, this need has increased in the Reg 19 version para 2.14, as amended by the errata document, now says:
“Employment land need is based on economic forecasts in the EDNA up to 2041.
• Sandwell is subject to a demand for 212ha of employment land.
• The current supply of land available and suitable for employment use is 42ha (after completions between 2020 – 2022 are considered). This includes windfall supply, generated through intensification / recycling, and also includes a vacant land supply of 28ha (sites identified under
Policy SEC1).
• Based on the amount of land required to grow the economy, there is a shortfall of around 170ha.
• In addition, the plan allocates / retains 1,193ha of existing occupied employment as strategic, local or other employment land.
20. HBF notes that the Plan therefore proposes not only significant unmet housing need but also a significant unmet employment need. This would further constrain the ambitions for Growth in Sandwell, and the wider region. HBF suggest these circumstances warrant a full Green Belt review and the allocation of sites to meet the housing and employment requirements of the Borough even if these are within the current Green Belt.
21. With regards the housing requirement itself, HBF strongly support the need for more housing in the Sandwell Local Plan for a variety of reasons including addressing the current housing crisis, meeting housing need, providing affordable housing and supporting employment growth. HBF would request that the Council considers the annual LHN as only the minimum starting point and fully considers all of the issues that may result in a need for a higher housing requirement, including the need to provide a range and choice of sites, the need for flexibility, viability considerations and whether higher levels of open-market housing are required in order to secure increased delivery of affordable housing.
22. Paragraph 22 of the NPPF requires that strategic policies should look ahead over a minimum 15-year period from adoption. HBF note that the current plan period is to 2041 but would still question if the plan period is long enough to cover this requirement. This Reg 18 consultation closes at the end of 2023 and then the representations need to be considered an analysed, a submission plan prepared and consulted, examination, main modifications consultation, inspectors report and adoption by the Council.
23. HBF suggest that the plan-making process may take some time, especially if additional Green Belt release is needed, and suggest that the plan period could be extended now, especially as this would require an update to the evidence base as is important for the evidence base to be consistent with the Plan Period. Extending the plan period would also require an increase to the housing requirement to cover the additional years, and consequential additional housing supply.
24. The Government’s commitment to 1.5 million homes over the next five years has seen ambitions to plan for 370,00 per year in order to deliver the national target of 300,000 new homes per year. HBF note that the standard method housing requirement has always been the minimum starting point for setting the housing requirement, and HBF support more housing than the standard method housing requirement in order to support economic growth, provide a range and type of sites and to support small and medium house builders.
25. HBF suggest that each of these reasons on its own could justify an increase in the housing requirement for Sandwell and the Council should consider planning for an additional amount of housing to address each reason in turn. However, as previously mentioned it is important that the housing requirement is established, before any consideration is given to any issues around housing land supply, or lack thereof.
26. The plan-led system requires Council to proactively plan to meet the needs of their community. This means that there is a need to provide a range and choice of sites, a need for flexibility and viability considerations to be taken into account, and a need for the Council to consider whether higher levels of open-market housing are required in order to secure the delivery of affordable housing and/or support economic growth.
27. Once the housing requirement has been set, the next phase is to consider housing land supply. It is important to both minimise the amount of any unmet needs that cannot be accommodated within the Borough and clearly set out how any unmet need will be addressed elsewhere. HBF recognise the constrained nature of the Borough and the size of the shortfall in Housing and Employment land being proposed in this plan. However, it is important that the housing needs of Sandwell are met in full.
28. Although HBF is pleased to see the Council commit to ongoing working with neighbouring authorities to try an address this matter under the Duty to Cooperate the fact remains that the Local Plan’s policies should ensure the availability of a sufficient supply of deliverable and developable land to deliver Sandwell’s housing requirement. If it is not possible to do this within the Council’s boundary then Green Belt should be considered.
29. Criteria 3 of the policy sets out that “Appendices B and C show how the housing and employment land ambitions for Sandwell will be met. Those development needs that cannot be accommodated within the borough will be exported to sustainable locations in neighbouring local authority areas, following consultation.” HBF suggest this should be set out as an integral part of the policy and not deferred to Appendix B and C.
30. HBF believe that Sandwell’s inability to meet its housing (and employment) needs requires revisiting the Spatial Strategy results in the ‘exceptional circumstances’ that would require the need for a Green Belt review as set out in para 140 of the NPPF.
31. As set out in our comments on the Duty to Cooperate above, HBF remains very concerned about the reliance of the Council on neighbouring authorities to deliver it’s unmet needs, especially in light of the issue the Shropshire Local Plan has recently encountered. These difficulties further underline the need for Sandwell to be doing more to meet its own needs including through a comprehensive Green Belt review and new allocations for housing.
Policy SDS6- Green Belt
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
32. HBF continune to strongly disagree with the conclusion in para 3.99 which says:
“It is the Council’s view that there are no exceptional circumstances in Sandwell that would justify amending current boundaries and releasing any areas of green belt for new development. While there is an identified shortfall of land suitable for housing and economic development, this of itself does not outweigh the need to maintain the openness and permanence of the green belt within Sandwell, especially given the densely developed and urban character of the rest of the borough.”
33. HBF are strongly of the view that planning to meet less than half of your identified housing need is clearly evidence of the exceptional circumstances required to justify releasing areas of green belt land.
34. HBF would argue that the current housing crisis and the inability of Sandwell meet its own needs provide the exceptional circumstances to necessitate a Green Belt review, which must include the consideration of both employment and housing sites.
35. NPPF (para 20) is clear that “Strategic policies should set out an overall strategy for the pattern, scale and design quality of places, and make sufficient provision housing (including affordable housing), employment, retail, leisure and other commercial development”. Para 11 of the NPPF states that “all plans should promote a sustainable pattern of development that seeks to: meet the development needs of their area; align growth and infrastructure; improve the environment; mitigate climate change (including by making effective use of land in urban areas) and adapt to its effects”.
36. HBF cannot see how a plan that provides for less than half of its housing requirement standard method baseline (and HBF argue the housing requirement itself should be higher) can meet the requirements to be positively prepared and setting out a clear long term vision for the area which is the purpose of plan-making. NPPF para 60 clearly states that “to support the government’s objective of significantly boosting the supply of homes, it is important that a sufficient amount and variety of land can come forward where it is needed, that the needs of groups with specific housing requirements are addressed and that land with permission is developed without unnecessary delay.”
37. HBF believes the Council’s inability to meet their own housing need in the midst of a housing consider is a factor that constitutes the exception circumstances that justify green belt release.
38. HBF support ambitious growth aspirations in Sandwell. HBF highlight the need to consider the interaction between employment and housing. An increase in the number of jobs can it itself generate a requirement for additional housing, and failure to provide housing can have negative impacts on the economic and social wellbeing of the area.
39. The Plan need to ensure there is a sufficiency of Housing Land Supply (HLS) to meet the housing requirement, ensure the maintenance of a 5 Year Housing Land Supply (5YHLS) and achieve Housing Delivery Test (HDT) performance measurements. HBF cannot see how achieving these aims is possible without Green Belt release. It is noted that this may in turn also effect the spatial strategy for the Local Plan.
40. HBF also suggest the Council should give explicit consideration to whether BNG development is acceptable within the Green Belt and/or if green belt boundaries need to be revised accommodate schemes that deliver off-site, and possibly even on-site biodiversity gains.
Policy SNE2- Protection and Enhancement of Wildlife Habitats
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
41. HBF note that although mandatory national BNG was introduced in the Environment Act 2021 the introduction of Biodoversty Net Gain for planning application did not come for large sites until Feb 12th 2024, and for small sites on 2nd April 2024.
42. HBF has been involved in a significant amount of work, being led by the Future Homes Hub, on BNG preparedness for some time, including feeding into the BNG Planning Practice Guidance and the DEFRA BNG Guidance. It is important for this policy to fully reflect all the new legislation, national policy and MHCLG and DEFRA guidance.
43. HBF note that this represents a lot of new information that the Council will need work though and consider the implications of, in order to ensure that any policy on Biodiversity Net Gain policy complies with the latest policy and guidance now it has been published. It should also be noted that the PPG is clear that there is no need for individual Local Plans to repeat national BNG guidance.
44. It is the HBF’s opinion that the Council should not deviate from the Government’s requirement for 10% biodiversity net gain as set out in the Environment Act. The Plan should provide certainty for developers and a clear BNG policy with a fixed 10% figure, rather than the policy including the phrase “at least 10%” would help to provide this.
45. Any requirements to go beyond 10% BNG needs to be clearly demonstrated with evidence including considering the implications of the policy approach as part of the whole plan viability appraisal. In particular, HBF would question how the viability of more than 10% BNG can be established when the market for off-site credits, and therefore the costs of delivering the 10% mandatory BNG system are still emerging.
46. HBF notes that the proposed policy wording and supporting text will need to reflect both that the Environment Act which requires 10% Biodiversity Net Gain, and the emerging policy, guidance and best practice on how Mandatory Biodiversity Net Gain will be implemented. There is an important policy distinction to made between the national mandatory requirements and any optional further requests from LPAs to go further and faster. In particular the 10% national target is non-negotiable from a viability perspective, but policies seeking over 10% can be challenged on viability grounds. This distinction needs to be recognised within the Local Plan.
47. HBF suggest particular care is needed in terminology to ensure the Sandwell policy reflects the national policy and guidance. For example, on site and off-site biodiversity is referred to as units, and the statutory national credit system of last resort is referred to as credit. It is important for the wording of the policy to accurately reflect the legalisation and guidance.
48. HBF question the wording of criteria five, as it should be for the BNG plan to set out what happens if monitoring shows any BNG measure are ineffective. For large and complex sites where the development is phased, the guidance is clear that the 10% must be delivered at the end of the development, and this may not result in 10% BNG on each phase.
49. It is also important to note that for large and complex sites where the development is phased, the guidance is clear that the 10% must be delivered at the end of the development, and this may not result in 10% BNG on each phase. Additional advice on phased development has been provided in the new BNG PPG.
50. The costs of BNG must also be considered as part of the whole plan viability assessment and should be specified as a single specific item, and not combined into a generic s106 costs item. There are significant additional costs associated with biodiversity net gain, which should be fully accounted for in the Council’s viability assessment, some of which remain unknown at this time. It is important that BNG does not prevent, delay or reduce housing delivery. The costs relate both the financial costs and also land take- which will impact on densities achievable if BNG is provided on site.
51. As this is still a new policy area and the market for off-site provision, and statutory credits are not yet known, any figure used for BNG costs will need to be kept under review as BNG implementation progresses and a greater understanding of actual costs become available. The Whole Plan Viability Assessment must clearly set out how it considered the implications of mandatory BNG and how it as arrived at using the most up to date BNG costs information available. There may need to be further additional flexibility in policies elsewhere in the Plan to reflect the non-negotiable nature of 10% BNG costs.
52. HBF suggest that there is also a need for this policy and supporting text to say more about how BNG will be considered in relation to applications in advance of the Local Nature Recovery Strategies. As the LNRS emerges it will be important for this Local Plan to be kept under review and further public consultation on the interaction between the two documents and/or changes to Local Plan policy and/or its implementation, to reflect the LNRS may be needed.
53. HBF would also encourage the Council to ensure the Local Plan fully considers the new BNG requirements in relation to site allocations. This is likely to require undertaking an assessment of the baseline to support the allocation to enable an understanding the BNG requirements for a site to be allocated and the impact this may have on viability and other policy requirements and considerations. It will be important to understand the BNG costs of mandatory BNG as this is non-negotiable and as such may impact on the viability of the site and its ability to deliver against other policy requirements such as affordable housing or other s106 asks.
54. HBF also notes that there seems to be significant potential for confusion around environmental hierarchy, and suggest particular care is needed to avoid any confusion between the well-established mitigation hierarchy and the new BNG hierarchy. There is need for the policy wording and/or supporting text to be clearer about the differentiation between the mitigation hierarchy (which seeks to avoid harm in the first place, then mitigate and only then compensate it in relation to protected habitats) and the BNG delivery hierarchy (which prioritises on-site BNG delivery, then off-site units and finally allows for statutory credits). There seems to be significant potential for confusion between the two difference hierarchies. HBF therefore suggest that the Council should take particular care to explain how the requirements of the two-part BNG hierarchy work in different ways and that they seek to achieve different aims.
55. BNG will also impacts on the density of housing schemes that can be provided, as land used for on-site BNG is not available for housing. This may require larger and/or additional housing sites to be allocated.
Policy SNE3 – Provision, Retention and Protection of Trees, Woodlands and Hedgerows
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
56. HBF continue to question how the Council arrived at the requirement for 3 replacement trees for everyone lost and what (if any) assumptions have been relation to the size and standard of trees. HBF considers that a three for one replacement policy could impact on the land uptake for any development and may have implications for the density of developments, which in turn has the potential to have an impact on the viability of developments.
57. HBF suggest further flexibility is needed in the policy, for example hedgerow removal may be an essential to gain access to a site, but BNG policies which require 10% net gain from the pre-development baseline so any loss would already have to be compensated. HBF suggest the Council should give more thought to how the suite of environmental policies are intended to work together so that developers are completely clear what is expected of them, and to ensure that the policies do not serve to make development undeliverable.
Policy SCC1 – Energy Infrastructure
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
58. HBF supports the Government’s intention to set standards for energy efficiency through the Building Regulations. The key to success is standardisation and avoidance of individual Council’s specifying their own policy approach to energy efficiency, which undermines economies of scale for product manufacturers, suppliers and developers. The Councils do not need to set local energy efficiency standards in a Local Plan policy because of the higher levels of energy efficiency standards for new homes set out in the 2021 Part L Interim Uplift and proposals for the 2025 Future Homes Standard. There is no need for a Local Plan policies on matters already addressed in Building Regulations.
59. HBF question the realism of requiring post-occupancy evaluation as this will require consent of future homeowners and willingness to share their data. This cannot be assumed.
Policy SCC4 - Embodied carbon and waste
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
60. HBF are concerned about the effectiveness and justification of this policy, especially as the Council acknowledge in para 5.63 of the Plan that there is no reference to ‘embodied carbon’ in the NPPF.
Policy SHO1- Delivering Sustainable Housing Growth
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
61. In relation to criteria one, HBF’s detailed comments in relation to the amount of housing needed in Sandwell can be found in our response to policy SD1: Development Strategy. In summary, HBF request that the standard method LHN should be the minimum starting point for establishing the housing requirement and the Council should then fully considers all of the issues that may result in a need for a higher housing requirement, including the need to provide a range and choice of sites, the need for flexibility, viability considerations and whether higher levels of open-market housing are required in order to secure increased delivery of affordable housing. HBF suggests that these considerations should result in a higher housing requirement for Sandwell which set be set out in the Local Plan. Only then should consideration around deliverability and housing land supply come into play, the housing requirement should be established first.
62. In relation to criteria two, HBF note that the council is looking to phase the plan and delivery of the housing requirement. For the plan to be effective and justified, a clear explanation of this approach and the reasoning behind for it is needed. As HBF is of the view that the overall housing requirement for Sandwell should be higher, it follows that our view is that the numbers in each phase should be higher too.
63. HBF remain of the view that the allocation of site for housing should be undertaken in policy and no relegated to an Appendix.
64. HBF supports the principal of discounted the housing land supply to take account of non-implementation rates. We note that site with planning permission include a lapse rate of 5% other commitments are SHLAA are discounted by 10% and occupied employment land discounted by 15%, but These figures should be clearly evidenced. HBF also notes that no allowance is made for non-delivery of windfall sites and we believe one is needed. HBF would question if the discount rates should in fact be higher especially for sites that are currently occupied in employment use. The anticipated loss of current employment sites to housing further underlines the need for housing and employment to be considered together, and implications of not meeting with the housing and employment need of the borough present the exceptional circumstances required to justify Green Belt release.
65. Para 7.4 of the Plan states that “A balanced range of sites has been provided, in terms of size, location and market attractiveness, which will help to maximise housing delivery over the Plan period. Across the borough, 10% of identified supply in the Plan and in the most recent Brownfield Register is on sites no larger than 1ha, which is in accordance with the requirement set out in the NPPF at paragraph 069.”
66. The NPPF requires Local Plans to identify land to accommodate at least 10% of the housing requirement on sites no larger than one hectare, unless there are strong reasons why this cannot be achieved. The HBF has undertaken extensive consultation with its small developer members. One of the chief obstacles for small developers is that funding is extremely difficult to secure without a full, detailed, and implementable planning permission. Securing an implementable planning permission is extremely difficult if small sites are not allocated. Without implementable consents lenders are uneasy about making finance available or the repayment fees and interest rates they set will be very high. Small developers, consequently, need to invest a lot of money and time up-front in the risky business of trying to secure an allocation and a planning permission, and this is money that many small developers do not have.
67. HBF would therefore wish to see the 10% small sites allowance delivered through allocations. Indeed, we would advocate that a higher percentage of small sites are allocated if possible. Such sites are important for encouraging the growth in SME housebuilders who will tend to develop these sites but rarely see the benefits that arise from the allocation of sites in a local plan. Up until the 1980s, small developers once accounted for the construction of half of all homes built in this country resulting in greater variety of product, more competition, and faster build-out rates. Since then, the number of small companies has fallen by 80%.
68. HBF also note that support for small and medium builders need not be limited to only small sites of less than 1Ha. SMEs also deliver on other types of non-strategic sites (for example up to 100 units). The inclusion of additional non-strategic allocations would expand the range of choice in the market, and (possibly most importantly), be of a scale that can come forward and making a contribution to housing numbers earlier in the plan period.
69. In relation to criteria three, HBF notes that NPPF (para 71) only permits an allowance for windfall sites if there is compelling evidence that such sites have consistently become available and will continue to be a reliable source of supply. HBF are also of the view that any buffer provided by windfall sites should be in addition to the buffer added to the housing need figures derived from the Standard Method to provide choice and competition in the land market. However, by including windfalls within the Plan’s housing requirement supply, any opportunity for windfalls to provide some additional housing numbers and flexibility is removed. Windfalls do not provide the same choice and flexibility in the market as additional allocations.
70. Criteria 3 indicates that regular monitoring will be undertaken annually of housing delivery, but this does not tally with the Monitoring Framework at the end of the Plan.
71. It should also be possible to see from Housing Trajectory how much reliance is being made on windfalls, or from when. To be both justified and effective the Housing Trajectory should include break down the housing numbers into different sources of supply. HBF are of the view that any allowance for windfall should not be included until the fourth year of a housing trajectory, given the likelihood that dwellings being completed within the next three years will already be known about (as they are likely to need to have already received planning permission to be completed within that timeframe).
Policy SHO2- Windfall Developments
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
72. As outlined above HBF are concerned about the Councils reliance on windfall in place of allocating housing sites. HBF also question whether it is appropriate to treat council owned land differently in policy terms from any other land. Consideration of who the applicant or landowner is, is not normally considered a to be a planning matter. The allocation of sites and the granting of permission of windfall should be considered on their planning merits and the contribution they can make to sustainable development, not who is the owner of the land.
73. HBF contend there is need for greenfield development in Sandwell to address the housing crisis and meet the housing requirement, some of these greenfield sites may need to be on Green Belt land. If monitoring showed underperformance of housing delivery additional housing will need to brough forward which could include allowing additional green field sites. The policy should be amended to account for this possibility.
74. It should also be noted that HBF also support the need for additional greenfield allocations to meet the housing requirement.
Policy SHO3- Housing Density, Type and Accessibility
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
75. The Regulation 19 policy continues to require densities of 100 dwellings per hectare for areas of very high density housing areas, 45 dwellings in ‘high accessible areas’ and 40+ for moderate area. Although the Table Six uses 100+, 45+ and 40+, so there is a need for consistency between the two.
76. Is it unclear from the policy wording if this policy only applies to allocated sites, or all development over 10 units. It is also unclear how a developer would know which target applied to their development and which standard to apply on a site not allocated in the plan. The Plan needs to better explain and justify its approach.
77. HBF would also question how realistic such high densities are, noting that the setting of residential density standards should be undertaken in accordance with the NPPF (para 125). HBF would also question how this policy links into other policies including the policies that seek to protect family housing, resist HMOs, limit tall buildings, prevent intensification, resist windfalls, and require a range and mix of housing. All of these policies may prevent densification. Indeed even the amount of land required for on-site BNG delivery may impact on the density that is delivered.
78. HBF suggest that density needs to be considered on a site by site basis to ensure schemes are viable, deliverable and appropriate for the site, and policy needs to include some flexibility if needed to enable it to respond to site specific circumstances.
79. HBF would question of the density proposed are realistic deliverable and viable as the deliverability of high-density residential development in Sandwell will be dependent upon the viability of brownfield sites and the demand for high density city centre living post Covid-19. It is important that delivery of the housing requirement does not rely overly ambitious intensification of dwellings.
80. HBF also question why there is need for a specific mention of 4+ bedroom houses in Criteria 5 of the policy as the wording of the policy as this presupposes no need for four bed houses in the evidence which may not be the case. The plan should also be read as a whole and the matter of responding to housing need it terms of size and type of units is already covered elsewhere in the Plan.
81. There is also no need for Criterion 6, in this or any other policy, as the Plan should be read as a whole, and decisions made in accordance with the policies in the plan, unless other material considerations indicate otherwise.
Policy SHO4- Affordable Housing
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
82. HBF welcomes the recognition that the delivery of affordable housing in Sandwell may raise issues of viability. Viability must be an integral part of the plan-making process, and the findings of the viability appraisal should have helped inform and test policy development. HBF have concerned about some of the detail of the Viability Assessment as it has not considered a number of key costs and requirements. For example, HBF information suggests that complying with the current new part L is costing £3500 per plot. The Future Homes Standard Part L in 2025 is anticipated to cost up to £7500+ per plot. There will also be the addition of the Building Safety Levy that is coming in pay for cladding. This will be a per plot basis around the UK, and initial values are around £1500- £2500 per plot. These costs appear to have not been considered in the viability appraisal.
83. Other factors that need to be taken into account include increasing costs of materials and labour due to inflation and the costs of mandatory BNG, which are still emerging as the off-site market is yet to be established. Although the initial price of statutory credits is now known this national fallback option has been deliberately highly priced to discourage their use. Whilst this intention is understandable, at present the lack of functioning local markets for off-site credits causes viability problems because HBF members experience to date suggests that any scheme that needs to rely on statutory credits becomes unviable. HBF have numerous concerns about the whole plan viability study, including the omission of some key policy costs. For example, an realistic and evidenced allowance for mandatory BNG needs to be includes within the viability assessment of the Local Plan.
84. The costs of BNG should have been considered as part of the planning obligations and should be specified as a single specific item. There are significant additional costs associated with biodiversity net gain, which should be fully accounted for in the Council’s viability assessment, some of which are unknown at this time. It is important that BNG does not prevent, delay or reduce housing delivery. As this is an emerging policy area and the market for off-site provision, and statutory credits are not yet known, any figure used for BNG costs will need to be kept under review as BNG implementation progresses and a greater understanding of actual costs become available. The Whole Plan Viability Assessment should clearly set out how it considered the implications of mandatory BNG and how it arrived at the most up to date BNG costs information available to use.
85. At a very basic level viability can be improved by reducing costs or increasing values. Sometimes, therefore changing the type of affordable housing provided can help to improve viability of a specific site, and the plan should recognise this. In this situation there could be a change of the percentages of different types of affordable housing provided, but the headline figure of how much affordable housing is provided would remain the same. Flexibility in the policy is important to allow for these kind of considerations.
86. The geographical distribution of development may impact on the Plan’s ability to deliver affordable housing where it is most needed. HBF notes that the level of open-market housing provided may also impact on the amount of affordable housing that can be developed.
87. It will be also be important to understand if there any geographically specific viability considerations, such as whether higher levels of open-market housing are required in particular areas in order to secure increased delivery of affordable housing in that location in a way that remains viable. Similarly, brownfield city centre sites tend to be most suited for apartments or retirement living. There will therefore be a need to include green fields allocations which are more likely to deliver family housing and a higher percentage of affordable housing, in order to provide flexibility in the housing land supply and ensure a range of housing types and tenures is provided. This adds further weigh to the need to consider Green Belt release(s).
88. The HBF does not comment on individual sites, other than to say the Plan should provide for a wide range of deliverable and developable sites across the area in order to provide competition and choice and a buffer to ensure that housing needs are met in full. The soundness of strategic and non-strategic site allocations, whether brownfield or greenfield, will be tested in due course at the Local Plan Examination.
Policy SHO5- Delivering Wheelchair Accessible and Self/custom build Housing
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
89. This policy still seeks to require all new residential developments to meet M4(2) (Accessible and adaptable dwellings) of Building Regulations and development of 10 or more units to provide 15% which meet M4(3) (Wheelchair user dwellings) on schemes of more than 20 homes.
90. The requirements to meet Part M4(2) will be superseded by changes to residential Building Regulations. The Government response to ‘Raising accessibility standards for new homes’ states that the Government proposes to mandate the current M4(2) requirement in Building Regulations as a minimum for all new homes, with M4(1) applying in exceptional circumstances. This will be subject to a further consultation on the technical details and will be implemented in due course through the Building Regulations. The requirement to address this issue is planning policy is therefore unnecessary.
91. HBF are of the view that this matter should be left to Building Regulations, however if a policy were to be needed, the wording needs to differentiate between Part a) and part b) of M4(3) technical standards. M43a sets out standards for wheelchair adaptable housing, where M43b relates to wheelchair accessible housing which can only be required on affordable housing where the Council has nomination rights. Any such requirements would also need to be fully considered from a viability perspective.
92. The PPG states:
“What accessibility standards can local planning authorities require from new development?
Where a local planning authority adopts a policy to provide enhanced accessibility or adaptability they should do so only by reference to Requirement M4(2) and/or M4(3) of the optional requirements in the Building Regulations and should not impose any additional information requirements (for instance provision of furnished layouts) or seek to determine compliance with these requirements, which is the role of the Building Control Body. They should clearly state in their Local Plan what proportion of new dwellings should comply with the requirements. There may be rare instances where an individual’s needs are not met by the wheelchair accessible optional requirement – see paragraph 011 below.
Local Plan policies should also take into account site specific factors such as vulnerability to flooding, site topography, and other circumstances which may make a specific site less suitable for M4(2) and M4(3) compliant dwellings, particularly where step free access cannot be achieved or is not viable. Where step-free access is not viable, neither of the Optional Requirements in Part M should be applied.”
Paragraph: 008 Reference ID: 56-008-20160519 Revision date: 19 05 2016
93. The PPG sets out some of the circumstances where it would be unreasonable to require M4(2) and M4(3) compliant dwellings. Such factors include flooding, typography and other circumstances. HBF suggest that flexibility is needed in the application of these standards to reflect site specific characteristics, and the policy wording should reflect this. HBF do not believe this policy is sound without this flexibility, as it fails to comply with national policy and is not effective or justified.
94. In relation to Self-Build and Custom Build Plots, the policy requires sites of 100 or more dwellings, to provide at least 5% as serviced plots for self and custom build, if there is evidence of demand. If after six months of a thorough an proportionate marketing exercise the plot remains unsold, the requirements falls away.
95. HBF does not consider that requiring major developments to provide for self-builders is appropriate. Instead, the HBF advocates for self and custom-build policies that encourage self and custom-build development by setting out where it will be supported in principle. The HBF considers that Councils can play a key role in facilitating the provision of land as set in the PPG. This could be done, for example, by using the Councils’ own land for such purposes and/or allocating sites specifically for self and custom-build home builders- although this would need to be done through discussion and negotiation with landowners.
96. It is considered unlikely that the provision of self and custom build plots on new housing developments can be co-ordinated with the development of the wider site. At any one time, there are often multiple contractors and large machinery operating on-site from both a practical and health and safety perspective, it is difficult to envisage the development of single plots by individuals operating alongside this construction activity.
97. HBF agree that if demand for plots is not realised, it is important that plots should not be left empty to the detriment of neighbouring properties or the whole development. The timescale for reversion of these plots to the original housebuilder should be as short as possible from the commencement of development because the consequential delay in developing those plots presents further practical difficulties in terms of co-ordinating their development with construction activity on the wider site. There are even greater logistical problems created if the original housebuilder has completed the development and is forced to return to site to build out plots which have not been sold to self & custom builders. Therefore, if the current policy requirements are retained HBF would support the suggestion that any unsold plots remaining after the 6-month marketing period revert to the original developer.
Missing Policy- Previous Policy SH06
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
98. The Reg 18 version of the Sandwell Local Plan included a very important policy called “Financial Viability Assessments for Housing”. HBF made comments on this policy saying “As the whole plan viability methodology uses typologies, this means there may be individual sites that are not viable, for example if the costs or vales of a specific site fall outside the parameters used of a typology that was tested. Some site will be on the very margins of viability and other sites may already be unviable even without a change of circumstances. HBF therefore support the recognition of the potential ned for flexibility in relation to site specific viability issues.”
99. The flexibility this policy offered is an important part of ensuring the Plan is effective and deliverability. A policy on this matter is needed for the Plan to be sound.
Policy SDM1 – Design Quality
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
100. HBF are supportive of the use of ‘Building for a Healthy Life’ as best practice guidance but suggest its use should remain voluntary rather than becoming a mandatory policy requirement. Building for a Healthy Life is not really a ‘standard’ to be achieved, but rather a toolkit for considering design and thinking about the qualities of successful places.
Policy SDM2 – Development and Design Standards
The Policy is not considered to be sound as it is not justified or effective or in line with national policy.
Nationally Described Space Standard
101. HBF does not support the introduction of the optional Nationally Described Space Standards though policies in individual Local Plans. If the Council wanted to do this, they will need robust justifiable evidence to introduce the NDSS, as any policy which seeks to apply the optional nationally described space standards (NDSS) to all dwellings should only be done in accordance with the NPPF , which states that “policies may also make use of the NDSS where the need for an internal space standard can be justified”.
102. The NPPF requires that all policies should be underpinned by relevant and up to date evidence, which should be adequate, proportionate and focussed tightly on supporting and justifying the policies concerned. The PPG identifies the type of evidence required to introduce such a policy. It states that ‘where a need for internal space standards is identified, local planning authorities should provide justification for requiring internal space policies. Local planning authorities should take account of the following areas:
• Need – evidence should be provided on the size and type of dwellings currently being built in the area, to ensure the impacts of adopting space standards can be properly assessed, for example, to consider any potential impact on meeting demand for starter homes.
• Viability – the impact of adopting the space standard should be considered as part of a plan’s viability assessment with account taken of the impact of potentially larger dwellings on land supply. Local planning authorities will also need to consider impacts on affordability where a space standard is to be adopted.
• Timing – there may need to be a reasonable transitional period following adoption of a new policy on space standards to enable developers to factor the cost of space standards into future land acquisitions’.
103. HBF also remind the Council that there is a direct relationship between unit size, cost per square metre (sqm), selling price per sqm and affordability. The Council’s policy approach should recognise that customers have different budgets and aspirations. An inflexible policy approach to NDSS for all new dwellings will impact on affordability and effect customer choice. Well-designed dwellings below NDSS can provided a good, functional home. Smaller dwellings play a valuable role in meeting specific needs for both open market and affordable home ownership housing.
104. An inflexible policy approach imposing NDSS on all housing removes the most affordable homes and denies lower income households from being able to afford homeownership. The introduction of the NDSS for all dwellings may mean customers purchasing larger homes in floorspace but with bedrooms less suited to their housing needs with the unintended consequences of potentially increasing overcrowding and reducing the quality of their living environment. The Council should focus on good design and usable space to ensure that dwellings are fit for purpose rather than focusing on NDSS.
105. HBF considers that if the Government had expected all properties to be built to NDSS that they would have made these standards mandatory not optional.
106. If the proposed requirement for NDSS is carried forward, then the Council should put forward proposals for transitional arrangements. The land deals underpinning residential sites may have been secured prior to any proposed introduction of the NDSS. These sites should be allowed to move through the planning system before any proposed policy requirements are enforced. The NDSS should not be applied to any reserved matters applications or any outline or detailed approval prior to a specified date.
107. The policy should be deleted.
Water efficiency in new dwellings
108. This policy also seeks to introduce a water efficiency standard of 110 litres/person/day. HBF note that Part G Building regulations already stipulates 125lpppd normal conditions and 110lpppd in water stressed areas. Therefore, HBF question whether there is a need for this to be referred to within the Local Plan as it is already required by other regulatory frameworks.
109. The policy should be deleted.
Delivery, Monitoring, and Implementation
110. HBF notes that we are in the midst of a Housing Crisis. Housing delivery is therefore a key challenge facing Sandwell Borough. To address the housing crisis the Council needs to allocate enough sites to meet the housing requirement and provide choice and flexibility in supply. This will require the allocation of a mix and range of sites in a variety of locations. The policies in the Plan with then near careful monitoring to ensure they are delivering the housing. The Sandwell Local Plan must ensure the delivery of new housing to meet both open market and affordable housing needs.
111. The issue of housing is critically important and needs urgently addressing through the plan-making process. HBF believes that the Council needs to explore any and all options to meet the housing need and requirement of Sandwell. This must include full consideration of the current Housing Crisis and if it results in the ‘exceptional circumstances’ that would require the need for a Green Belt review. A plan that seeks to meet only third of the need does not deliver is simply not good enough and does represent an effective use of the plan-led system.
112. HBF suggest more flexibility is needed within the plan, so that it is able to respond to any changing circumstances. HBF do not support the inclusion of policies within a Local Plan that merely triggers a review of the Local Plan if monitoring shows housing delivery is not occurring as expected. Such a policy does nothing to address the housing crisis or undersupply of homes. There are other more effective and immediate measures that could be introduced into policy that would enable the Council to address housing under deliver, much more quickly than would be possible through the production of another plan, or plan review.
113. It is important that houses are brought forward, and the matter addressed as soon as possible, if under delivery is observed. HBF would suggest, as a minimum, explicit reference should be made within the Plan’s policy to the potential to bring forward supply earlier. However, as the housing need and requirement figures for the Plan are minimum (not maximum) figures the Council could also specifically identify reserve sites, particular sites that could/would be brought forward sooner to address any under delivery whatever the reason for that under performance. This could be a shortfall in market housing permissions granted and/or completions, affordable housing permissions granted and/or completions and any failure against the Housing Delivery Test or local plan monitoring. More is needed on how and when monitoring will be undertaken and more is needed on what action(S) will be taken when if monitoring shows under delivery of housing.
114. There remains a need to address issues that are wider-than-local matters in a joined-up manner under the Duty to Cooperate. HBF suggest that this means there is a need for housing monitoring to be undertaken across the wider region. If other areas are providing housing to meet Sandwell’s need, Sandwell will need to be monitoring this delivery to ensure its needs are being met. However, HBF firmly believe Sandwell should be doing more to address its own needs, including Green Belt release.
115. The HBF would encourage the Council to fully consider the housing needs of the Borough and robustly consider the need for additional housing in the housing requirement before then considering how much of the housing requirement can be met within the Borough, and how much may be unmet. It is important for the housing requirement to reflect the housing needs and growth aspirations of the Borough and not be restricted by capacity considerations, which should be considered after the housing requirement has been set.
116. HBF suggest that the monitoring framework at the end of the Plan needs to be expanded. The Council will need to monitor the delivery of housing and publish progress against a published Housing Trajectory Housing monitoring should be undertaken on a site-by-site basis. Therefore, the detailed housing trajectory including for specific sites should be inserted included within the Plan.
117. HBF note that as we are in the midst of a housing crisis, it is very important that the Council ensures that the Local Plan delivers all the housing that is being planned for. Sandwell should also monitor the delivery of any unmet need by neighbouring authorities and actively participate in local plan consultation and examination to ensure the need for other authorities to meet their need is robustly supported in neighbouring Local Plans.
Appearance at the EIP and Future Engagement
118. HBF requests to participate in the Hearing Sessions for the Local Plan Examination, the HBF considers that their involvement is necessary to ensure that the home building industry is able to respond to any housing related issues raised during the hearing sessions.
Comment
Sandwell Local Plan - Reg 19 Publication
Representation ID: 1665
Received: 11/11/2024
Respondent: Historic England
We welcome a reference to heritage within this policy.
Spatial Portrait - We welcome the many references to the history of Sandwell as a Borough and the local historic environment of the area.
Ambitions - We would have welcomed a reference to the historic environment within the ‘ambitions’ of the Plan.
Vision - We welcome the many references to the historic environment within the vision.
Strategic Objectives - We welcome the inclusion of Objective 4. It should reference the need to protect the significance of heritage assets to ensure that all typologies are accurately referenced and considered within the policy. Again, we welcome Objective 5 and this would benefit from referencing ‘heritage assets’ rather than ‘historic assets’.
Policy SDS1 clause j - We support the inclusion of a reference to heritage within this policy. We welcome the amendments from the previous version. The policy should relate to ‘heritage assets’ and would benefit from the removal of the term ‘designated’.
Policy SDS2 clause i - Remove ‘unacceptable level of’ from the policy text. We are supportive of energy efficiency measures for heritage assets; however, they must be appropriate and suitable to the context of the building they are being applied to and not cause harm to the significance of heritage assets. Further, the policy would benefit from some justification text setting out the specific considerations for energy efficiency measures and the historic environment to provide more certainty and reference the need for other measures such as listed building consent.
Clause j) - Re-word this clause. Harm to heritage should be wholly/ exceptional. The policy should reference the need to protect the significance of heritage assets, including their setting rather than only refer to setting. Harm should be avoided or minimised.
Policy SDS3 - We reiterate our previous comments that the policy would benefit from a reference to the historic environment and specifically the Wednesbury High Street Action Zone, as well as text about relevant heritage led regeneration programmes within Sandwell. We note a brief reference in paragraph 3.54.
Policy SDS4 clause 1, ai - See previous comments about the need to remove the reference to ‘call for sites’ as these sites ay be suggested but be inappropriate for development.
Green and Blue Infrastructure, including Policy SDS8 - We reiterate our comments as raised previously about the need to include the historic environment and heritage landscapes as a component of blue and green infrastructure, more far reaching than a reference to Registered Parks and Gardens.
Policy SNE4 - We continue to support the inclusion of this policy in the Plan. Our previous comment relating to the need include protection of the significance of the asset and its integrity, are still relevant here.
Policy SNE5 - We welcome the amendments to this policy for heritage.
Policy SNE6 - We continue to support the inclusion of this policy and the references to the historic environment.
Section Historic Environment - We welcome a specific section on the historic environment being incorporated into the Plan, and policies for the historic environment.
We are supportive of the introductory paragraphs which do a very good job of setting the scene for the historic environment of the area and are an interesting read.
Paragraph 4.108 - Should also refer to non designated heritage assets which also have protection, albeit to a lesser extent than designated heritage assets.
Paragraph 4.113 - Should be referred to as ‘heritage assets’ and elsewhere throughout the Plan.
Policy SHE1 - We welcome the amendments the Council has made to the policy since our previous comments, and this has been gratefully received. We would recommend that clause 4 is amended slightly to read ‘…seek to conserve and enhance the significance of listed buildings by exercising appropriate control in their setting, over the design of …’ to ensure that the policy relates to the significance (which is what is protected).
Policy SHE2 - We welcome the policy. We consider that it needs a clause akin to Policy SHE1 clause 2, that then relates to all other heritage assets aside from listed buildings and conservation areas. Insert the clause into this policy also to be compliant with the National Planning Policy Framework (NPPF) Section 16.
Clause 3, consider a minor edit on this section to ensure that ‘all’ heritage assets are protected.
We welcome clause 5 and specific detail about the local character of Sandwell.
SHE3 - We welcome the amendments to this policy.
SHE4 - We welcome the amendments to this policy. Clause 3 amend ‘significant adverse effect’ with ‘harm’.
Policies SCC1-SCC6 - See previous comments at Regulation 18 stage, December 2023.
Policy SH02 clause 2, c. - We support this clause.
Policy SH09 - The policy would benefit from a clause relating to the need to protect the significance of heritage assets and their setting and any harm will be resisted.
Employment section - We consider within this section there could be a reference to the benefit of the historic environment; heritage led regeneration, heritage tourism, public realm, the economic benefit that heritage assets bring to an area including Conservation Areas, Wednesbury High Street Action Zone and the benefit of heritage assets in revitalising the town centre economy and relevant issues on shopfronts and design within heritage centres. See Regulation 18 comments.
Policy SCE1 - See previous comments to Regulation 18 consultation.
Paragraph 9.171 - Can the policy/ Plan do anything to overcome the vacancy rate and heritage at risk of these assets?
Page 306 - We welcome the reference to the Wednesbury High Street Action Zone and its success. Are there any lessons learned from this exercise that can be utilised in other retail areas across Sandwell, which could also benefit from heritage led regeneration? And can the Plan reference any hooks in the relevant sections to assist with future opportunities and delivery.
Policy SWB1 - The policy would benefit from a clause on the historic environment.
Policy STR1 - See comments to Regulation 18 Local Plan. How has the historic environment been considered when safeguarding land for future transport development? For example, do you have any information relating to clause 1?
Policy STR2 - See comments to Regulation 18 Local Plan. How has the historic environment been considered when safeguarding land for future transport development? For example, do you have any information relating to clause 2?
Policy STR5 - There may be opportunities to ‘better reveal the significance’ of heritage assets through proposed walking and cycling routes. It would be beneficial if the policy sought to utilise any of these opportunities if they arise.
Policy STR6 clause a - Is the policy identifying any strategic park and ride sites at this stage? If so, are there any considerations for the historic environment?
Policy SWA3 - What assessment has been undertaken to assess the preferred locations for waste sites and whether there are any implications for the historic environment? We note that no sites have been allocated at this stage but are keen to ensure all relevant heritage considerations and assessments are undertaken at the appropriate stage and that preferred locations for new development does not give any weight in the planning process to an allocation/ planning permission, without the appropriate assessment being undertaken.
Policy SWA4 clause d - The policy needs a clause relating to the historic environment within this section and the need to protect the significance of heritage assets, including their setting. Setting does not only relate to a visual relationship but can also relate to how you can experience a heritage asset and if this is affected through noise, smells and traffic for example.
Policy SMI1 - We cannot find any information relating to proposed mineral allocations at this time.
Policy SMI2 - We welcome a reference to heritage within clause 5, b) however, we consider that it should state should protect the significance of heritage assets, including their setting. The policy should also make provision for appropriate restoration principles, that consider the sensitivity of the historic environment and wider historic landscape, within which mineral sites may be located.
Paragraph 13.108 - We support the reference to cumulative impacts because often in minerals working, it is the cumulative impact of a number of minerals workings in one location that cause harm to the significance of heritage assets and the wider historic landscape.
It would be beneficial if the justification text referenced the need for appropriate restoration principles for minerals working sites.
Policy SDM4 - We welcome a reference to heritage within this policy.
Policy SDM3 - Clause 1 should reference the available historic environment townscape evidence base that Sandwell Council has and has been referenced elsewhere in the document. Any proposed tall building should take account of its context and other existing landmark sites, such as heritage assets, in gauging what height is appropriate. Referencing the existing evidence base can help inform development proposals. Where a heritage asset is currently a key landmark on the skyline such as a church spire, then this should remain as the principle landmark site on the skyline and other new development should respect its height and position on the skyline.
Clause 5 c) Re-word the policy clause so that ‘the proposal will not cause harm to the significance of heritage assets, including their setting’.
Clause 5 g) Consider re-wording this clause to ensure prominence of existing key landmarks remain and to avoid a homogenous skyline within the Borough.
Clause 6 a) how will this be achieved?
Add in a clause to ensure that any applications for tall buildings are accompanied by a Heritage Assessment, where relevant.
We are not aware of any locations that have been identified for tall buildings within this Plan. If the Council are considering locations, then we would welcome a meeting to discuss and ascertain what heritage assessment has been undertaken to date.
Policy SDM4 - The policy should include a clause of how to consider advertisements in relation to heritage assets including individual listed buildings and within Conservation Areas, to ensure that only appropriate advertisements are included and there is no harm to the significance of heritage assets. We usually see this in Local Plan Advertisements policies. Additional information in the justification text would be beneficial.
Policy SDM5 - The policy should include a clause on how to assess Shop Fronts where they are also heritage assets. Some of the clauses within the current policy wording would not be appropriate in the context of historic shop fronts. They are also likely to require listed building consent, and this would be worthwhile to include within the policy text. We usually see this contained within Local Plan Shopfront policies. Additional information in the justification text would be beneficial.
Appendices from Page 11 - Site Allocations
SH14 – How will the site consider the Grade II heritage asset, within its boundary? What harm may occur and can this be overcome. Cannot locate the specific heritage assessment for this site when searching under the site reference or address.
SH34 – The site includes Ridge and Furrow within the site. The site assessment states that mitigation is possible but there are no details about what the possible mitigation measures are and how this can be considered within the site. We would require the retention of ridge and furrow and appropriate design to consider this heritage asset. At present there is no reference of how to overcome the harm to this site. However, we note that this site is subject to planning approval and as such consider that these issues will have been addressed at planning application stage.
SH51 – The site would need to demonstrate that harm to Highfields, Grade II can be overcome and that suitable mitigation measures are available to avoid/ minimise the harm. There is no proposed mitigation measures within the further information relating to this site in the further information in the Plan, and so we remain concerned with regards to this development.
SM5 – we remain concerned about this site and how the development can come forward given the heritage assets on site and the lack of information surrounding the proposed development at this time. There is no information within the appendices relating to the site allocations for this site and whether there are any mitigation measures that are suitable to avoid/ minimise the harm to heritage assets.
Smethwick police station site – no site reference within the assessment - we remain concerned about this site and how the development can come forward given the heritage assets in close proximity to the site and the lack of information surrounding the proposed development at this time. The mitigation measures in the assessment are not suitable to assess whether any harm to heritage could be avoided. There is no information within the appendices relating to the site allocations for this site and whether there are any mitigation measures that are suitable to avoid/ minimise the harm to heritage assets.
SH66 – Wednesbury Police Station - no site reference within the assessment - we remain concerned about this site and how the development can come forward given the heritage assets in close proximity to the site and the lack of information surrounding the proposed development at this time. The mitigation measures in the assessment are not suitable to assess whether any harm to heritage could be avoided. There is no information within the appendices relating to the site allocations for this site and whether there are any mitigation measures that are suitable to avoid/ minimise the harm to heritage assets.
Former Corus Premises – unclear from information in the Plan – is no development proposed on this site? The heritage assessment states there are heritage assets to consider but no further development and no reference within the Plan to the potential for harm or appropriate mitigation measures.
British Gas – Land off Dudley Road – it is possible for harm to occur to the Canal Conservation Area and a mitigation measure could be included to ensure appropriate design and siting to ensure harm avoided to the canal and the potential for it to have an enhancement opportunity if appropriate development considerations were taken forward.
Roway Lane, Oldbury – what heritage asset is the heritage assessment referring to and how will development not harm any heritage asset on the site? Unclear on the evidence base relating to this site.
SH44 Wyndmill Farm – the assessment relates to Bustleholm Farm as a heritage asset. What type of heritage asset is this? We cannot find it located on the National List. The assessment states no further development on this site, is this correct?
SM2 – concerns relating to this site. There are a number of heritage assets listed in the site assessment as being in proximity to the site, including the presence of archaeology on the site. The assessment concludes no harm but we consider a more detailed heritage assessment is required for this site to understand what heritage may be impacted and whether there are any appropriate mitigation/ avoidance measures. There is nothing within the Local Plan appendices relating to heritage yet there is a need for a masterplan where issues could be considered.
SM3 – concerns relating to this site. There are a number of heritage assets that could be affected by proposed development and the heritage assessment concludes development should have regard to heritage assets. Further assessment is required. Additionally, there is no reference to heritage assets or potential mitigation measures within the Local Plan appendices.
SM4 - concerns relating to this site. There are a number of heritage assets that could be affected by proposed development and the heritage assessment concludes development should have regard to heritage assets. Further assessment is required. Additionally, there is no reference to heritage assets or potential mitigation measures within the Local Plan appendices.
SM6 - concerns relating to this site. There are a number of heritage assets that could be affected by proposed development and the heritage assessment concludes development should have regard to heritage assets. Further assessment is required. Additionally, there is no reference to heritage assets or potential mitigation measures within the Local Plan appendices.
SM1 Chances Glassworks – there is no heritage assessment for this site. There are a number of heritage assets within the site and within proximity to the site so a detailed heritage assessment for this site is essential to assess whether development can come forward and if appropriate avoidance/ mitigation measures exist to overcome the harm to heritage. We recognise that this could be a location for heritage led regeneration and a heritage assessment will provide a useful process to assess the harm and the potential to ensure that an appropriate policy can be included within the Local Plan, if relevant.
General point – any development being proposed which could have an impact on a Canal Conservation Area, should be fully considered at this stage and a mitigation measure included within the ‘further information’ section in the Local Plan appendices to ensure it is fully considered at planning application stage.
General point – we would welcome a meeting with the Council to discuss their Regulation 19 site allocations and to ensure that any site which could have the potential to harm heritage assets has been considered through the heritage assessment (where planning permission/ commencement has not occurred). It is, in cases a little unclear, as to whether all the relevant sites have been assessed. Where we have raised comments above, we would be grateful to discuss these specific sites in more detail and to assess whether there are appropriate mitigation measures that can be included within the Plan.
General point – white land – what is this policy criteria relating to? There is no policy within the Local Plan which relates to white land and how it should be considered? Are there any implications for the historic environment?