Draft Regulation 18 Sandwell Local Plan

Search representations

Results for Home Builders Federation search

New search New search

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO1 - Delivering Sustainable Housing Growth

Representation ID: 978

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

64. HBF also question the need for Criteria 6 about BNG to be repeated here within the policy (and in other policies elsewhere in the Plan) when this matter has already been addressed elsewhere within the Plan, and the Plan should be read as a whole. To repeat this only this policy requirement here seems repetitious and confusing. HBF comments on BNG can be found in response to Policy SNE2 which is the appropriate place for them to be considered.
HBF does not believe it there is any need to repeat the requirements of policy SNE2 here.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO2 – Windfall developments

Representation ID: 979

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

65. Policy SHO2- Windfall Developments

66. As outlined above HBF are concerned about the Councils reliance on windfall in place of allocating housing sites. HBF also question whether it is appropriate to treat council owned land differently in policy terms from any other land. Consideration of who the applicant or landowner is, is not normally considered a to be a planning matter. The allocation of sites and the granting of permission for windfall housing should be considered on their planning merits and the contribution they can make to sustainable development, not who is the owner of the land.

67. HBF contend there is need for greenfield development in Sandwell to address the housing crisis and meet the housing requirement, some of these greenfield sites may need to be on Green Belt land. If monitoring showed underperformance of housing delivery additional housing will need to brought forward which could include allowing additional green field sites. The policy should be amended to account for this possibility.

68. It should be noted that HBF also support the need for additional greenfield allocations to meet the housing requirement.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO3 - Housing Density, Type and Accessibility

Representation ID: 980

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

Policy SHO3- Housing Density, Type and Accessibility

69. This policy requires a density of 100 dwellings per hectare for areas of ‘very high-density’ housing areas, 45 dwellings in ‘high accessible areas’ and 40+ for ‘moderate area’. Although the Table Six uses 100+, 45+ and 40+, so there is a need for consistency between the two.


70. Is it unclear from the policy wording if this policy only applies to allocated sites, or all development over 10 units. It is also unclear how a developer would know which target applied to their development and which standard to apply on a site not allocated in the Plan. The Plan needs to better explain and justify its approach.

71. HBF would also question how realistic such high densities are, noting that the setting of residential density standards should be undertaken in accordance with the NPPF (para 125). HBF would also question how this policy links into other policies in the Plan including the policies that seek to protect family housing, resist HMOs, limit tall buildings, prevent intensification, resist windfalls, and require a range and mix of housing. All of these policies may prevent densification. Indeed, even the amount of land now required for on- site BNG delivery may impact on the density that is delivered.

72. HBF suggest that density needs to be considered on a site by site basis to ensure schemes are viable, deliverable and appropriate for the site, and policy needs to include some flexibility if needed to enable it to respond to site specific circumstances.

73. HBF would question of the density proposed are realistic deliverable and viable as the deliverability of high-density residential development in Sandwell will be dependent upon the viability of brownfield sites and the demand for high density city centre living post Covid-19. It is important that delivery of the housing requirement does not rely overly ambitious intensification of dwellings.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO3 - Housing Density, Type and Accessibility

Representation ID: 981

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

74. HBF also question why there is need for a specific mention of 4+ bedroom houses in Criteria 6 of the policy as the wording of the policy as this presupposes no need for four bed houses in the evidence which may not be the case. The plan should also be read as a whole and the matter of responding to housing need it terms of size and type of units is already covered elsewhere in the Plan.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO4 - Affordable Housing

Representation ID: 982

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

Policy SHO4- Affordable Housing

75. HBF welcomes the recognition that the delivery of affordable housing in Sandwell may raise issues of viability. Viability must be an integral part of the plan-making process, and the findings of the viability appraisal should have helped inform and test policy development. HBF are particularly concerned about the disconnect between the Nov 2023 viability study and the policies in the Sandwell Local Plan.

76. Para ES17 of the Aspinall Verdi, Nov 2023, Viability Report says “Based on our residential market research, we recommend that the policy should be differentiated by housing market zone and greenfield/brownfield land. This reflects the range of values across Sandwell and the different risks/costs associated with greenfield and brownfield development. This approach optimises the ability of SMBC to deliver affordable housing and fund infrastructure (through land value capture) with-out undermining delivery.


ES 18 The table below sets out our recommendations for the affordable housing targets, derived from the viability analysis herein. These targets assume no grant. These are in line with Sandwell’s affordable housing policy.

New Value Zones
Affordable Housing Greenfield
(baseline 25%) Brownfield
Affordable Housing (baseline 25%)
High Value Zone 25% 25%
Medium Value Zone 15% 10%
Lower Value Zone 10% 0%”

77. Policy SH04 however seeks 25% affordable housing where viable and does not differentiate between greenfield and brownfield sites. The policy therefore does not reflect the evidence and the evidence does not reflect the policy.

Object

Draft Regulation 18 Sandwell Local Plan

Justification

Representation ID: 983

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

79. HBF do not recognise this interpretation of the NPPF [that a minimum of 10% affordable housing must be secured and could be Sandwell's baseline] or the approach to Viability in plan-making being suggested by [Aspinall Verdi]. NPPF and PPG are clear that if whole plan viability testing shows a contribution for affordable housing is not viable, then Local Plan policy should not seek to impose one. The policies need amending to ensure they reflect the viability realities of delivering development in Sandwell. To meet the tests of soundness the plan must be viable and deliverable. It is simply not possible to ignore evidence which shows the policies in the Plan would make development unviable.

Object

Draft Regulation 18 Sandwell Local Plan

Justification

Representation ID: 984

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

80. HBF have further concerns about some of the other detail in the [Aspinall Verdi] Viability Assessment as it has not considered a number of key costs and requirements. For example, HBF information suggests that complying with the current new part L is costing £3500 per plot. The Future Homes Standard Part L in 2025 is anticipated to cost up to £7500+ per plot. There will also be the addition of the Building Safety Levy that is coming in pay for cladding. This will be a per plot basis around the UK, and initial values are around
£1500- £2500 per plot. These costs appear to have not been considered in the viability appraisal.

81. Other factors that need to be taken into account include increasing the costs of materials and labour due to inflation and the costs of mandatory BNG, which are still emerging as the off-site market is yet to be established. Although the initial price of statutory credits is now known this national fallback option has been deliberately highly priced to discourage their use. Whilst this intention is understandable, at present the lack of functioning local markets for off-site credits causes viability problems because HBF members experience to date suggests that any scheme that needs to rely on statutory credits becomes unviable. HBF have numerous concerns about the whole plan viability study, including the omission of some key policy costs. For example, a realistic and evidenced allowance for mandatory BNG needs to be includes within the viability assessment of the Local Plan.

82. The costs of BNG should have been considered as part of the planning obligations and should be specified as a single specific item, no rolled into any total policy costs. There are significant additional costs associated with biodiversity net gain, which should be fully accounted for in the Council’s viability assessment, some of which are unknown at this time. It is important that BNG does not prevent, delay or reduce housing delivery. As this is an emerging policy area and the market for off-site provision, and statutory credits are not yet known, any figure used for BNG costs will need to be kept under review as BNG implementation progresses and a greater understanding of actual costs become available. The Whole Plan Viability Assessment should clearly set out how it considered the implications of mandatory BNG and how it arrived at the most up to date BNG costs information available to use.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO4 - Affordable Housing

Representation ID: 985

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

83. At a very basic level viability can be improved by reducing costs or increasing values. Sometimes, therefore changing the type of affordable housing provided can help to improve viability of a specific site, and the plan should recognise this. In this situation there could be a change of the percentages of different types of affordable housing provided, but the headline figure of how much affordable housing is provided would remain the same. Flexibility in the policy is important to allow for these kind of considerations.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO4 - Affordable Housing

Representation ID: 986

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

84. The geographical distribution of development may impact on the Plan’s ability to deliver affordable housing where it is most needed. HBF notes that the level of open-market housing provided may also impact on the amount of affordable housing that can be developed.

85. It will be also be important to understand if there any geographically specific viability considerations, such as whether higher levels of open-market housing are required in particular areas in order to secure increased delivery of affordable housing in that location in a way that remains viable. Similarly, brownfield city centre sites tend to be most suited for apartments or retirement living. There will therefore be a need to include green fields allocations which are more likely to deliver family housing and a higher percentage of affordable housing, in order to provide flexibility in the housing land supply and ensure a range of housing types and tenures is provided. This adds further weigh to the need to consider Green Belt release(s).

86. The HBF does not comment on individual sites, other than to say the Plan should provide for a wide range of deliverable and developable sites across the area in order to provide competition and choice and a buffer to ensure that housing needs are met in full. The soundness of strategic and non- strategic site allocations, whether brownfield or greenfield, will be tested in due course at the Local Plan Examination.

Comment

Draft Regulation 18 Sandwell Local Plan

Policy SHO5 - Delivering Wheelchair Accessible and Self / Custom Build Housing

Representation ID: 987

Received: 13/12/2023

Respondent: Home Builders Federation

Representation Summary:

89. The requirements to meet Part M4(2) will be superseded by changes to residential Building Regulations. The Government response to ‘Raising accessibility standards for new homes’ states that the Government proposes to mandate the current M4(2) requirement in Building Regulations as a minimum for all new homes, with M4(1) applying in exceptional circumstances. This will be subject to a further consultation on the technical details and will be implemented in due course through the Building Regulations. The requirement to address this issue is planning policy is therefore unnecessary.

90. HBF are of the view that this matter should be left to Building Regulations, however if a policy were to be needed, the wording needs to differentiate between Part a) and part b) of M4(3) technical standards. M43a sets out standards for wheelchair adaptable housing, where M43b relates to wheelchair accessible housing which can only be required on affordable housing where the Council has nomination rights. Any such requirements would also need to be fully considered from a viability perspective.

For instructions on how to use the system and make comments, please see our help guide.